L&T Begins D-Wall Work for Ahmedabad Metro’s TBM Launch Shaft

After Afcons Infrastructure started work for a tunnel boring machine (TBM) launch shaft on Ahmedabad Metro’s Package-1 in early September, workers from Larsen & Toubro have now also started excavation work for building a diaphragm wall (D-wall) for their TBM launch shaft at Kalupur Railway Station on Package-2 of the 20.737 km Line-1 which will connect Vastral Gam and Thaltej Gam.

Once the shaft is ready, L&T plans to deploy two TBMs, and possibly an additional TBM, manufactured by Hubei Tiandi Heavy Industries (THI) which previously saw action in Delhi to build tunnels on the 6.3 km package CC-27 (Hauz Khas – Shankar Vihar) of Phase 3’s new Magenta Line. Both machines are currently being refurbished by Terratec in Ahmedabad and are planned to undergo factory acceptance tests (FAT) in December.

L&T was awarded a Rs 901 crore contract for Ahmedabad Metro’s 4.378 km underground package-2 in January 2017, and their scope involves the construction of twin tunnels from the Kalupur Railway Station’s TBM launch shaft to the West Ramp through 2 underground stations at Ghee Kanta and Shahpur in the old part of the city –

6.83 km underground section of Ahmedabad Metro’s Phase 1 – view Ahmedabad Metro map & info

Photo Copyright: Sunil Rao

Photo Copyright: Sunil Rao

As of today, L&T has built 4 panels for the D-wall. Here’s a nice video demonstrating the role of the grabber excavator in building the panels –

For more updates, check out the Ahmedabad section of The Metro Rail Guy!

– TMRG

written by

Global traveler who prefers mass rapid transit

5 Responses to "L&T Begins D-Wall Work for Ahmedabad Metro’s TBM Launch Shaft"

  1. Aayush says:

    Good. Any update on rolling stock?

    Reply
    • TMRG says:

      Nothing yet, unfortunately. Unless they borrow trains like Nagpur did, it won’t be possible to start operations before 2020 now.

      Reply
  2. TMRG says:

    Everyone – I’m going to be out for the next 7 days. Feel free to send me updates/news via the ‘Contact’ page, and I’ll cover it when I’m back.

    Cheers
    TMRG

    Reply
  3. shazeb says:

    hey i has checked the apparel park depot site inspection and maintainance shed construction is going on

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Aayush Cancel reply

Your email address will not be published. Required fields are marked *