Sohna Elevated Road – Information & Status Update
21.65 km Sohna Elevated Corridor project (NH 248A) in Haryana is an operational 6-lane access controlled expressway with a route alignment connecting Rajiv Chowk in Gurugram to KR Mangalam University in Sohna.
The project had a construction deadline of June 2022 and was inaugurated / opened to vehicles on July 11, 2022. In the future, it will serve as the northern terminal to the under construction 1350 km Delhi – Mumbai Expressway.
- Total Estimated Cost: Rs. 1,466 crore
- Length: 21.65 km
- Lanes: 6 lanes + local lanes
- Owner: National Highway Authority of India (NHAI)
- Status: Completed
- Completion Deadline: June 2022
- Opened: July 11, 2022
- Project Model: Engineering, Procurement & Construction (EPC)
Route Map
Status Update: Opened
Here’s a video by Rajan Singh (RSLive) showing the expressway on its inauguration day (July 11, 2022):
Tenders & Contractors
Sohna Elevated Road project has been divided into 2 civil packages with a 24 month deadline.
Package | Contractor |
Package 1: Rajiv Chowk in Gurugram to Badshahpur (8.94 km) | Oriental Structural Engineers (OSE) |
Package 2: Badshahpur to K.R. Mangalam University in Sohna (12.71 km) | H.G. Infra Engineering Ltd. (HGIEL) |