Nagpur – Goa Expressway – Information & Status

760 km Nagpur – Goa Expressway (Shaktipeeth Expressway) by MSRDC is a proposed 6 lane access-controlled highway with a route alignment in Maharashtra.

The project will connect Pavnar (near Wardha) and Patradevi (Pernem Taluk) and provide access to pilgrimage sites in Vidarbha – Marathwada – Western Maharashtra – Goa.

The project was first announced by Devendra Fadnavis in September 2022. Shortly after MSRDC in October 2022 invited tenders for appointing a Consultant to prepare its feasibility study report, detailed project report (DPR) and assistance with land acquisition.

Nagpur – Goa Expressway will be connected to the under construction 701 km Samruddhi Mahamarg (Mumbai – Nagpur Expressway) in Wardha, just south of Nagpur.

The expressway is expected to reduce travel time between Nagpur and Goa to about 7 hours from the current 21 hour journey.

  • Total Estimated Cost: 75000 crore
  • Project’s Length: 760 km
  • Lanes: 6
  • RoW: 100m
  • Status: DPR Prepared
  • Land Acquisition Required: TBD
  • Deadline: TBD
  • Owner: Maharashtra State Road Development Corporation Limited (MSRDC)
  • Project Model: Engineering, Procurement and Construction (EPC)

Route Map

An official PDF route map of the project will be added here when available. A village list will be provided when available.

Current Status

In October 2022, MSRDC invited tenders for appointing a Consultant to prepare its feasibility study report, detailed project report (DPR) and provide assistance with land acquisition. In January 2023, MSRDC received 3 bids.

Tenders & Contractors

This section will be updated when tender notices for its construction are published.

PackageStatus / Contractor
Feasibility Study & Detailed Project Report (DPR)3 Bids Received in January 2023
TBDTBD

Page last updated: February 29, 2024. Have a question or spot an error? Let me know here.