Trans-Haryana Expressway – Information & Status

227 km Trans-Haryana Expressway (NH-152D) or Gangheri – Narnaul Highway by NHAI is an under construction 4 lane access-controlled road with a route alignment connecting Ismailabad / Gangheri near Ambala with Narnaul in south Haryana.

This north-south greenfield expressway is being developed under Bharatmala Pariyojana as part of the 301 km Ambala – Kotputli Economic Corridor. Its sole objective is to reduce the distance and travel time between Ambala and Jaipur, and to provide an alternate route bypassing Delhi.

  • Total Estimated Cost: Rs. 5,108 crore
  • Project’s Total Length: 227.020 km
  • Lanes: 4 with partial service lanes
  • Status: Under Construction
  • Deadline: 2021-end
  • Owner: National Highways Authority of India (NHAI)
  • DPR Preparer: SA Infrastructure Consultants
  • Project Model: EPC (Engineering, Procurement and Construction)

Project Overview

Route Map

The expressway passes through 8 districts of Kurukshetra, Kaithal, Karnal, Jind, Rohtak, Bhiwani, Charkhi Dadri, and Mahendergarh. The road will connect NH-152 at Gangeri (near Ismailabad) and ends at Narnaul bypass near the Haryana-Rajasthan Border.

The road will intersect the Delhi – Amritsar – Katra Expressway at Pilu Khera or thereabouts near Jind.

Current Status

Land acquisition for its construction was completed in 2018 and NHAI awarded 8 construction contracts between March – December 2019 – a bulk of them to Gawar Constructions.

July 2020 Update:

March 2021 Update

Tenders & Contractors

Trans Haryana Expressway has been divided into 8 civil packages with a 24 month deadline. Tenders for its construction were invited in November 2018 (packages 5-8), February 2019 (packages 1-4), and re-invited in May 2019 (packages 1-3).

Package & ChainageContractor
Package 1 (23 km): Ismailabad on NH-152 to Junction with Karnal-Pehowa road SH-9 near Dhand (Ch 0.000 to Ch 23.000)JianXi Construction Engineering – CEIGALL – Shiv Build India JV
Package 2 (33 km): Junction with Karnal-Pehowa road SH-9 to Junction with Kaithal-Safidon SH-11 road near Rajound (Ch 23.00 to 56.00)Gawar Constructions
Package 3 (24 km): Junction with Kaithal-Safidon road SH-11 near Rajound to JN with Jind-Safidon road SH-14 near Kheri village (Ch 56.00 to 80.00)Galfar Engineering & Contracting (India)
Package 4 (28 km): Junction with Jind-Safidon road near Kheri village to Junction with NH-352 (Jind-Gohana section) near Julana (Ch. 80.000 to 108.000)JianXi Construction Engineering – Shiv Build India JV
Package 5 (23 km): Junction with NH-352 (Jind-Gohana) near Julana to Junction with NH-9 (Rohtak-Jind section) near Kharkara (Ch. 108.000 to 131.000)Gawar Constructions
Package 6 (34 km): Junction with NH-9 (Rohtak-Jind section) near Kharkara to Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri (Ch. 131.000 to 165.000)Gawar Constructions
Package 7 (35 km): Junction with NH-334B (Charkhi Dadri-Jhajjar section) near Charkhi Dadri to Junction with Rewari-Kanina road (SH-24) near Kanina (Ch. 165.000 to 200.000)Gawar Constructions – Shivalaya Construction Co. JV
Package 8 (27.02 km): Junction with Rewari-Kanina road (SH-24) near Kanina to Narnaul (Ch. 200.000 to 227.020)Gawar Constructions