Kharagpur – Vizag Expressway – Information & Status
783 km Kharagpur – Cuttack – Visakhapatnam (Vizag) Expressway project by NHAI is a proposed access-controlled road with a route alignment in West Bengal, Odisha and Andhra Pradesh.
Kharagpur Visakhapatnam Expressway’s detailed project report (DPR) has not been prepared or published online. Land acquisition hasn’t started for its construction.
This high-speed corridor is planned to be developed under the PM Gati Shakti National Master Plan framework with a primary objective of enabling integrated infrastructure and economic development through coordinated planning and implementation.
- Total Estimated Cost: TBD
- Project’s Total Length: 783 km
- Lanes: TBD
- Status: DPR Preparation (18 bids received in November 2024)
- Deadline: TBD
- Owner: National Highways Authority of India (NHAI)
- Project Model: TBD
Current Status
In June 2024, India’s Ministry of Road Transport & Highways (MoRTH) invited bids to appoint a consultant for developing Kharagpur – Visakhapatnam Expressway’s Detailed Project Report (DPR) under 2 packages:
- Package 1: Kharagpur – Chandikhol – Cuttack – Khorda – Tangi (390 km)
- Package 2: Tangi – Brahampur – Visakhapatnam (393 km)
In November 2024, MoRTH received a total of 18 bids – 10 for Package 1 and 8 for Package 2 – see bidder list here.
The consultant will suggest whether to develop the corridor as a semi access-controlled ‘economic corridor’ or a full-fledged expressway with better design and safety standards.
Route Map
Kharagpur – Visakhapatnam Expressways official PDF route map showing its alignment will be added here when finalized and available.
The following map sourced from MoRTH’s tender document shows its indicative alignment along NH-16:
Tenders & Contractors
This section will be updated when tenders are invited for this expressway’s construction.