Jaipur Metro – Information, Map & Updates

Menu: Construction Updates | Overview


The Jaipur Metro system is an urban Mass Rapid Transit System (MRTS) serving Rajasthan’s capital & biggest city. Construction for its 9.63 km Pink line under Phase 1A started in 2011 and became operational in June 2015. Construction on Phase 1B, a 2.35 km extension of the Pink line, started in January 2014 and is expected to be operational in 2018. Phase 2 of the project includes a new Orange line which will connect the heart of the city with the Airport and onward to the Sitapura Industrial Area. This line is planned to be built on the Public-Private Partnership (PPP) model and is yet to be approved.

Key Figures

Operational: 9.63 km (Phase 1A) | Under Construction: 2.35 km (Phase 1B) | Proposed: 23.099 km (Phase 2)

Operational Network: Phase 1A

The embedded maps below can be zoomed into!

Future Network (2018): Phase 1A & 1B

Key for map below: Phase 1 (Operational) | Phase 1B  (Under Construction)

Future Network (2024 est.): Phase 1 & 2

Key for map below: Phase 1 – Pink Line  | Phase 2 – Orange Line

Pink line: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp, Chandpole, Chhoti Chaupar, Badi Chaupar

Orange line: Sitapura Industrial Area, Pratap Nagar, Haldi Ghati Gate, Sanganer (Airport), Laxmi Nagar, Durgapura, Mahavir Nagar, Gopalpura, Dev Nagar, Tonk Phatak, Gandhi Nagar Mor, Sawai Mansingh Stadium, Narayan Singh Circle, Sawai Mansingh Hospital, Ajmeri Gate, Government Hostel, Sindhi Camp, Subhash Nagar, Pani Pench and Ambabari

List of Major Contractors

Contract Details Contractor
GC General Consultancy Services Mott MacDonald
RS8 40 Coaches (Rolling Stock) BEML Ltd.
E1/E2 Signalling & Telecommunications Alstom India
TVS Automatic Fare Collection (AFC) Samsung SDS
C1 6.472 km viaduct DSC Limited
C2 4.5 km viaduct ITD-ITD CEM JV
C3 Chandpol underground station ITD-ITD CEM JV
C4 Mansarovar Depot Pratibha-Aparna JV
C5 4 Stations at Mansarovar, New Aatish Market, Vivek Vihar & Shyam Nagar BL Kashyap & Sons
C6 2 Stations at Ram Nagar & Civil Lines BL Kashyap & Sons
C7 2 Stations at Railway Station & Sindhi Camp KMV Projects – RVR Projects JV
1B/C1 2.35 km underground twin tunnels & 2 stations at Choti Chaupar & Badi Chaupar CEC-CICI JV

History – Key Dates

Phase 1
03 June 2015: Mansarovar – Chandpole (Pink Line) – 9.63 km