Jaipur Metro Phase 2 – Information, Route Maps, Tenders & Updates

Menu: News & Construction Updates | Phase 1 Info | Phase 2 Info

Information

Jaipur Metro Phase 2 project proposes 1 new 23.51 km metro rail line (Orange Line) with 21 stations connecting Ambabari – India Gate (Sitapura Industrial Area). This line is planned to be built on the Public-Private Partnership (PPP) model and is yet to be approved.

Phase 2’s Detailed Project Report (DPR) was prepared in March 2010, revised in April 2011, April 2014 and July 2014. In June 2017, a consortium of Egis Rail – Feedback Infra was appointed to revise it once again, but their contract was terminated in 2018 which led to a legal battle. They had estimated Phase 2 to cost approximately Rs. 9500 crore.

The DPR document can be viewed here.

  • Jaipur Metro Phase 2 Deadline: Unannounced
  • My Completion Estimate: 2030

In its most recent form, the Orange Line will now be entirely elevated with 21 stations. By eliminating the underground section through the old city the total estimated cost has been brought down to Rs. 4546 crore.

Per the DPR – instead of Sindhi Camp, Chandpole Station is now recommended to serve as an interchange between the pink and orange lines. At the southern end, the line is now shown to make a big semi-circle detour towards Sanganer Sethu, presumably to allow for a greater height clearance from flights coming in to land at Jaipur Airport’s 09/27 runway.

DMRC recommends using 2.90 m wide trains (rolling stock) with a stabling / maintenance depot at Sitapur Industrial Area on a 27 hectare land parcel. The rake requirements lists that a total of 15 3-car trains will be sufficient to operate in 2031 with a headway of 7 minutes. Trains must be compliant to run “driverless” on the UTO (unattended train operation) mode.

For signaling, they recommend using CBTC (Communication based Train Control System). On the construction side, segment box girders are recommended for use on roads with a width of 30m, U-girders for other roads and I-girders for sharp curves.

Jaipur Metro Phase 2 Route

Line-2 Orange Line: Ambabari – India Gate (Sitapura Industrial Area)

  • Length: 23.51 km
  • Type: Elevated
  • Depot: Sitapur Industrial Area
  • Number of Stations: 21
  • Station Names:  Ambabari, Pani Petch, Subash Nagar, Collectorate, Chandpole (interchange), Government Hostel, Ashok Marg, SMS Hospital, Narayan Singh Circle, Ram Bagh Circle, Tonk Phatak, Gandhi Nagar Raiway Station, Dev Nagar, Mahaveer Nagar, Durgapura, B2 Bypass, Sanganer Sethu, Pinjarapole Gaushala, Haldi Ghati Gate, Kumbha Marg and India Gate
  • Note: This line was earlier going to be underground between Ajmeri Gate, Government Hostel, Sindhi Camp, Subhash Nagar and Pani Pench.
  • Status: Proposed (DPR reworked & submitted by DMRC in June 2020; Final modifications underway)

An official PDF route map of Jaipur Metro will be added here when available.

Jaipur Metro Future Network (2030) – By Line

Key for map below: Pink Line | Phase 2: Orange Line

Jaipur Metro Future Network (2030) – By Phase

Key for map below: Pink Line: Phase 1A, Phase 1B & Phase 1C  | Phase 2: Orange Line

Jaipur Metro Tenders

Latest Jaipur Metro (JMRC) tender notices can be viewed on JMRC’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.

Jaipur Metro Phase 2 Contractors

ContractContractor
Phase 2 Detailed Project Report (DPR) Preparer – 2010Delhi Metro Rail Corporation (DMRC)
Phase 2 Detailed Project Report (DPR) Reviser – 2017Egis Rail – Feedback Infra JV (contract terminated in 2018)
Phase 2 Detailed Project Report (DPR) Revisor – 2019Delhi Metro Rail Corporation (DMRC)

Click on ‘News & Construction Updates’ below for project news, progress and updates.

Menu: News & Construction Updates | Phase 1 Info | Phase 2 Info

Page last updated: December 27, 2023. Have a question or spot an error? Let me know here