Phase 1 Information
Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) began construction work on Hyderabad Metro’s 72 km Phase 1 project in April 2012 under the Public-Private Partnership (PPP) model.
The first section (Miyapur – Ameerpet – Nagole) opened in November 2017 and the last section (JBS – MGBS) opened on February 7 2020.
Phase 1 Routes
This phase involves the construction of 3 new lines on standard gauge tracks:
Line-1 – Red Line – Miyapur – L B Nagar (29.87 km)
• Type: Elevated
• Depot: Miyapur
• Stations (27): Miyapur, JNTU College, KPHB Colony, Kukatpally, Balanagar, Moosapet, Bharatnagar, Erragadda, ESI Hospital, SR Nagar, Ameerpet, Punjagutta, Errum Manzil, Khairatabad, Lakdi-ka-pul, Assembly, Nampally, Gandhi Bhavan, Osmania Medical College, MG Bus Station, Malakpet, New Market, Musarambagh, Dilsukhnagar, Chaitanyapuri, Victoria Memorial, LB Nagar
Line-2 – Green Line – JBS Parade Ground – MGBS (9.6 km)
• Type: Elevated
• Depot: Nagole
• Stations (9): Jubilee Bus Station (JBS) Parade Ground, Secunderabad West, Gandhi Hospital, Musheerabad, RTC X Roads, Chikkadpally, Narayanaguda, Sultan Bazaar and Mahatma Gandhi Bus Station (MGBS)
• Note: This line was originally envisioned to be 14 kms long and connect Falaknuma. Construction through the old city (5 km section) could never commence due to local politically influenced protests over land acquisition.
Line-3 – Blue Line – Nagole – Raidurg (28 km, 23 stations)
• Type: Elevated
• Depot: Nagole
• Stations (23): Nagole, Uppal, Stadium, NGRI, Habsiguda, Tarnaka, Mettuguda, Secunderabad East, Parade Ground, Paradise, Rasoolpura, Prakash Nagar, Begumpet, Ameerpet, Madhura Nagar, Yousufguda, Jubilee Hills Road No. 5, Jubilee Hills Check Post, Peddamma Temple, Madhaour, Durgam Cheruvu, Hitec City, Raidurg
The embedded maps below can be zoomed into!
Phase 1 Route Map
An official PDF route map of Hyderabad Metro’s original Phase 1 network can be viewed and downloaded here.
Key for map below: Phase 1 (Operational) | Phase 2 (Planned)
Tenders
Latest Hyderabad Metro (HMRL) tender notices can be viewed on the HMRL’s website. News on these notices, their bidders and contracts are covered in further detail on the news & construction page.
List of Major Contractors
iContract | Contractor |
Concessionaire | L&T Metro Rail Hyderabad |
Operations & Maintenance Contractor | Keolis |
Owner’s Engineer (General Consultant) | AECOM – Feedback Infra JV |
Programme Manager | Parsons Brinckerhoff |
Independent Engineer | Louis Berger Consulting |
Independent Safety & RAMS | Halcrow |
Traffic Consultants | LEA Associates |
Financial Consultants | Deloitte Touche Tohmatsu |
Carbon Credits Consultant | Ernst & Young |
Detailed Design Engineer for 6 stations at Ameerpet, Parade Grounds, Mahatma Gandhi Bus Station, Panjagutta, Hi-Tech City, and Jubilee Hills Checkpost | Mott MacDonald |
Rolling Stock | Hyundai Rotem |
CBTC Signaling | Thales Group |
History – Key Dates
Phase 1
• 29 November 2017: Nagole – Ameerpet (Blue Line) – 17.60 km
• 29 November 2017: Miyapur – Ameerpet (Red Line) – 12.20 km
• 24 September 2018: Ameerpet – LB Nagar (Red Line) – 16 km
• 20 March 2019: Ameerpet – HITEC City (Blue Line) – 8.5 km
• 29 November 2019: HITEC City – Raidurg (Blue Line) – 1.5 km
• 7 February 2020: JBS – MGBS (Green Line) – 9.6 km
Click on ‘News & Construction Updates’ below for project news, progress and updates.