Jaipur Metro with one 11.98 km line & 11 stations is an urban Mass Rapid Transit System (MRTS) built to serve Jaipur, Rajasthan’s capital & biggest city.

Construction work on Jaipur Metro’s 9.63 km Phase 1 (Pink Line) with 9 stations started in 2011. This mostly elevated line opened for commercial services in June 2015.

Construction on Jaipur Metro’s 2.35 km Phase 1B, an underground extension of the Pink Line with 2 stations, started in January 2014 partially funded through a $157 million (Rs 969 cr) loan from the Asian Development Bank (ADB). This extension became operational on September 23, 2020.

Jaipur Metro’s 23 km Phase 2 includes a new Orange line which will connect the heart of the city with neighborhoods close to the Airport and onward to the Sitapura Industrial Area. This line is planned to be built on the Public-Private Partnership (PPP) model and is yet to be approved.

System Specifications

  • Top Speed: 80 kmph
  • Average Speed: 32 kmph
  • Track Gauge: Standard Gauge – 1435 mm (lines 5-9)
  • Electrification: 25 kV, 50 Hz AC OHE
  • Signalling: Cab Signalling/Distance to Go

Key Figures

Operational: 11.98 km (Phase 1A & Phase 1B) | Under Construction: 0 km | Proposed: 28.27 km (Phase 1C, Phase 1D & Phase 2)

  • Daily Ridership: 37,000/day (March 2023)
  • Rolling Stock: 40 coaches (10 train-sets x 4) supplied by BEML

Jaipur Metro Operational Lines (Phase 1A and Phase 1B)

Line-1 Pink Line: Mansarovar – Badi Chaupar

  • Length: 9.63 km (Phase 1A) and 2.35 km (Phase 1B)
  • Type: Elevated & Underground
  • Depot: Mansarovar
  • Number of Stations: 11
  • Stations Names: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp and Chandpole, Chhoti Chaupar, and Badi Chaupar

Jaipur Metro Proposed Lines (Phase 1C, Phase 1D and Phase 2)

Line-1 – Pink Line: Badi Chaupar –  Transport Nagar (Phase 1C)

  • Length: 3.41 km
  • Type: Underground (2.65 km) & Elevated (0.76 km)
  • Number of Stations: 2
  • Station Names: Ramganj Chaupar (underground) & Transport Nagar (elevated)
  • Status: Approved (bidding underway)

Line-1 – Pink Line: Mansarovar to Ajmer Road Chauraha  (Phase 1D)

  • Length: 1.35 km
  • Type: Elevated
  • Number of Stations: 1
  • Station Names: Ajmer Road Chauraha
  • Status: Proposed (DPR prepared; Geotechnical bids invited March 2023)

Line-2 Orange Line: Ambabari – India Gate (Sitapura Industrial Area) (Phase 2)

  • Length: 23.51 km
  • Type: Elevated
  • Number of Stations: 21
  • Station Names:  Ambabari, Pani Petch, Subash Nagar, Collectorate, Chandpole (interchange), Government Hostel, Ashok Marg, SMS Hospital, Narayan Singh Circle, Ram Bagh Circle, Tonk Phatak, Gandhi Nagar Raiway Station, Dev Nagar, Mahaveer Nagar, Durgapura, B2 Bypass, Sanganer Sethu, Pinjarapole Gaushala, Haldi Ghati Gate, Kumbha Marg and India Gate
  • Note: This line was earlier going to be underground between Ajmeri Gate, Government Hostel, Sindhi Camp, Subhash Nagar and Pani Pench.
  • Status: Proposed (DPR reworked & submitted by DMRC in June 2020; Final modifications underway)

Jaipur Metro Operational Route Map (Phase 1A, 1B)

The embedded map below shows the exact location of all stations and can be zoomed into!

An official PDF route map of Jaipur Metro will be added here when available.

Jaipur Metro Future Network (2030) – By Line

Key for map below: Pink Line | Phase 2: Orange Line

Jaipur Metro Future Network (2030) – By Phase

Key for map below: Pink Line: Phase 1A, Phase 1B, Phase 1C & Phase 1D | Phase 2: Orange Line

Jaipur Metro Fares (Ticket Prices)

Fares on the Jaipur Metro are calculated based on the number of stations traveled traveled and dependent on type:

Token (best for single journeys) – minimum of Rs. 6 and maximum of Rs 18 for travel during off-peak hours

• 0 to 2 stations: Rs 6
• 3 to 5 stations: Rs 12
• 6 to 8 stations: Rs 18

Store Value Cards (best for multiple journeys) offer the following discounts:

• Less than Rs. 10 – Nil
• Rs 10 to Rs. 19.99 – 10%
• Rs 20 or more – 15%

Tourist Cards of two types are offered for unlimited trips:

• One-day Tour Card: Rs. 100 total, with a fare value of Rs. 50 and refundable security deposit of Rs. 50

• Three-day Tour Card: Rs. 200 total, with a fare value of Rs. 150 and refundable security deposit of Rs. 50

Group Tickets: Issued to groups of more than 20 commuters for a 10% discount

Jaipur Metro Tenders

Latest Jaipur Metro (JMRC) tender notices can be viewed on JMRC’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.

Jaipur Metro Contractors

ContractDetailsContractor
GCGeneral Consultancy ServicesMott MacDonald
RS840 Coaches (Rolling Stock)BEML Ltd.
E1/E2Signalling & TelecommunicationsAlstom India
TVSAutomatic Fare Collection (AFC)Samsung SDS
C16.472 km viaductDSC Limited
C24.5 km viaductITD-ITD CEM JV
C3Chandpol underground stationITD-ITD CEM JV
C4Mansarovar DepotPratibha-Aparna JV
C54 Stations at Mansarovar, New Aatish Market, Vivek Vihar & Shyam NagarBL Kashyap & Sons
C62 Stations at Ram Nagar & Civil LinesBL Kashyap & Sons
C72 Stations at Railway Station & Sindhi CampKMV Projects – RVR Projects JV
1B/C12.35 km underground twin tunnels & 2 stations at Choti Chaupar & Badi ChauparCEC-CICI JV
PH2Topographical Survey for preparation of 48 km Phase 2’s Detailed Project Report and extn of Phase 1B to RamganjJJ Engineers
PH2Traffic and Transportation StudyICRA Management Consulting Services Ltd.

Jaipur Metro History (Key Dates)

• 03 June 2015: Mansarovar – Chandpole (Pink Line) – 9.63 km
• 23 September 2020: Chandpole – Badi Chaupar (Pink Line) – 2.35 km

Click on ‘News & Construction Updates’ below for project news, progress and updates.