Pune Ring Road – Information & Status

136.80 km Pune Ring Road by MSRDC is a proposed 4-6 lane access-controlled highway with a circular route alignment around Pune, Maharashtra.

This highway with a vehicle speed limit of 120 kilometres per hour will connect the taluks of Khed, Haveli, Purandhar, Bhor, Mulshi and Maval. It’s alignment has been divided into 3 sections:

  • Eastern Alignment (Part-1): Urse-Soli, common with PMRDA’s Pune Inner Road project
  • Eastern Alignment (Part-2): Solu – Varve (Kelawade)
  • Western Alignment: Urse – Varve

The expressway is expected to be completed and opened in 2030 (current deadline). The project has been allocated nearly Rs 11,000 crore for land acquisition from 83 villages.

  • Total Estimated Cost: Rs. 15,857 crore
  • Project’s Length: 136.80 km
  • Lanes: 6 lanes for 97.80 km and 4 lanes for 39 km
  • Lane Width: 3.75m
  • RoW: 90-110m
  • Design Speed: 120 kmph
  • Status: Land Acquisition & Under Bidding for Construction
  • Owner: Maharashtra State Road Development Corporation (MSRDC)
  • Project Model: DBFOT

Route Map

An official PDF route map of the ring road with village and district information will be added here when available.

The project includes 8 tunnels with a total length of 11.29 km.

Current Status

As of July 2024, construction contract finalization and land acquisition is underway. The expressway is expected to be completed and opened in 2030 (current deadline).

Tenders & Contractors

MSRDC had invited RfQ applications for the expressway’s civil construction in April 2023. 18 civil construction firms had qualified.

MSRDC invited RfP bids for construction in January 2024 and opened bids in April 2024. Financial bids were opened in May 2024.

Package (Length) & ChainageStatus
PRR W1 (14.65 km): -0.650 to 14.000 – Urse to Village Kemsewadi in Tq Maval MulshiMegha Engineering and Infrastructures (MEIL) is lowest bidder
PRR W2 (20.00 km): 14.000 to 34.000 – Village Kemsewadi to Village Morewadi in Tq MulshiNavayuga Engineering Company (NECL) is lowest bidder
PRR W3 (14.00 km): 34.000 to 48.000 – Morewadi to Village Vardade Khamgaon Maval in Tq Mulshi and HavelNavayuga Engineering Company (NECL) is lowest bidder
PRR W4 (7.50 km): 48.000 to 55.500 – Vardade Khamgaon Maval to Village Kalyan Rahatwade in Tq Haveli Navayuga Engineering Company (NECL) is lowest bidder
PRR W5 (9.30 km): 55.500 to 64.800 – Kalyan Rathwade to Shivare Kusgaon Phase Tq Haveli BhorGR Infraprojects (GRIL) is lowest bidder
PRR E1 (11.85 km): 0.650 to 12.500 – Village Urse to Village Indori in Mawal TahsilMegha Engineering and Infrastructures (MEIL) is lowest bidder
PRR E2 (13.80 km): 12.500 to 26.300 – Indori to Chimbali Tq Mawal and KhedPNC Infratech is lowest bidder
PRR E3A & E3B (21.20 km): 26.300 to 47.500 – PRR E3A: Chimbali to Solu Tq Khed; PRR E3B: Solu to Lonikand Km Tq Khed and HaveliMegha Engineering and Infrastructures (MEIL) is lowest bidder
PRR E4 (24.50 km): 47.500 to 72.000: Village Lonikand Near Village Walti Tq HaveliRoadway Solutions (RSIIL) is lowest bidder
PRR E5 (9.565 km): Km. 72.335 Valati, Taluka Haveli to Km. 81.900 Sonori, Taluka Purandar, District Pune2 Bids Submitted in September 2024
PRR E6 (16.000 km): Km. 81.900 Sonori to Km. 97.900 Garade Taluka Purandar, District Pune4 Bids Submitted in September 2024
PRR E7 (6.240 km): Km. 97.900 Garade, Taluka Purandar to Km.104.140 Shiware, Taluka Bhor, District Pune2 Bids Submitted in September 2024

Page last updated: September 12, 2024. Have a question or spot an error? Let me know here.