NCC Wins Bengaluru Suburban Rail’s Package C4B for 9 Stations

NCC was today declared as the lowest bidder for the civil construction work…

Read more

L&T Casts Agra Metro Line-2’s 1st Set of U-Girders

Larsen & Toubro (L&T) on Monday poured concrete to cast their first…

Read more

IRCON Wins Mumbai Metro Line-6’s Power Supply & E&M Contract CA-233

Besides Line-4’s systems Package CA-236, IRCON International on Thursday…

Read more

IRCON – Jakson JV Wins Mumbai Metro Line-4’s Power Supply & E&M Contract CA-236

IRCON International – Jakson Ltd. JV on Wednesday was declared as the…

Read more

L&T – Alstom Win Mumbai Metro Line 4’s Rolling Stock & Signaling Contract CA-234

Larsen & Toubro (L&T) on Friday was declared as the lowest bidder to…

Read more

5 Bidders for Hyderabad Regional Ring Road Southern Section’s DPR Consultant

Five design and engineering firms have submitted bids to prepare a Detailed…

Read more

HGIEL Launches Delhi Metro’s U-Girders at Mongolpuri over Railway Line

H.G. Infra Engineering (HGIEL) this week launched two pre-stressed concrete…

Read more

Mumbai Metro Line-6’s Station Finishing Contracts Awarded for 13 Stations

Mumbai Metropolitan Region Development Authority (MMRDA) in January awarded…

Read more

6th OWG for Mumbai – Ahmedabad Bullet Train Launched over WDFC near Surat

M G Contractors Pvt. Ltd. (MGCPL) on Friday completed launching their sixth open web girder (OWG) bridge for the 508.17 Mumbai – Ahmedabad High Speed…

Read more

No Bidders for Gurugram Metro’s Proof Checking Consultant Contract

Gurugram Metro Rail Ltd. (GMRL) this week received zero bids for the Proof Checking Consultant contract of Gurgaon Metro‘s 28.5 km new…

Read more

3 Bidders for Bengaluru Suburban Rail’s Head Hardened Rails Contract

Three firms on Friday submitted bids to supply 19000 MT of head-hardened rails for the 149.35 km Bengaluru Suburban Rail project after Karnataka’s…

Read more

URCC Wins Bangalore Metro Veerannapalya Station’s Contract for Pending Work

URC Constructions Pvt. Ltd. was today declared as the lowest bidder for the balance construction works of Veerannapalya Station on Bangalore Metro’s…

Read more

L&T Casts Agra Metro Line-2’s 1st Pile Cap at Agra Cantt

Larsen & Toubro this week poured concrete to cast their first pile cap for the civil construction of Agra Metro Phase 1 project’s 15.09…

Read more

SYSTRA Wins Bangalore Metro Phase 3’s Design Consultant Contracts

February 1, 2025 Update: I hear as per bidding conditions, one firm can only be awarded a maximum of two packages. BMRCL is currently carrying out financial…

Read more