Excellent Videos from Behind the Scenes of Hyderabad Metro’s Precast Yard & Uppal Depot
Here are two recently uploaded short videos on the Hyderabad Metro system that takes us behind the scenes into one of the segment casting yards and the Uppal Depot where the OCC building is also located. These promotional videos were uploaded by L&T Metro Rail (Hyderabad) Limited and make for a good watch. If you’re short of time, I’d definitely recommend watching the second one.
Uppal Depot – Hyderabad Metro Rail
Hyderabad Metro Rail – Work Force
As a reminder, trials are currently being conducted on two different stretches of 2 lines:
• Line 3’s Nagole to Mettuguda stretch – See: Hyderabad Metro’s Nagole – Mettuguda Stretch Likely to Start Operations in Mid 2016
• Line 1’s Miyapur to SR Nagar stretch – See: Hyderabad Metro Extends Trials to SR Nagar on Miyapur – LB Nagar Line
For more images & updates on the Hyderabad Metro, check out the Hyderabad section of The Metro Rail Guy!
– TMRG
Leave a Reply
Want to join the discussion?Feel free to contribute!