Chennai – Mysore High-Speed Rail (CBM Bullet Train) project is a 463 km proposed High Speed Rail line that will connect Chennai, Bangalore (Bengaluru) and Mysore (Mysuru) through 11 stations in Tamil Nadu and Karnataka at a project cost that is yet to be finalized.
This is the sixth of six new high speed rail corridors, planned by the Government of India in 2019, for which basic tendering activity commenced in December 2020 to prepare a Detailed Project Report (DPR) towards starting construction work.
This HSR line will have a Right of Way (ROW) of 17.5m +/- 5m as required. Land acquisition of a total of 1162 hectares in 313 villages will be required for construction.
The project will be constructed in 2 phases. In Phase 1, 306 km of route will connect Chennai – Bengaluru, while in Phase 2 the line will be extended by 157 km from Bengaluru to Mysuru.
The line will consist of a 30 km tunnel network with 2.5 km in Chennai, 11.8 km in Chittoor, 2 km outside of Bengaluru and 14 km within Bengaluru city.
Key Figures
Operational: 0 km | Under Construction: 0 km | Proposed: 463 km
System Specifications
- Maximum Speed: 350 kmph
- Operational Speed: 320 kmph
- Average Speed: 250 kmph
- Track Gauge: Standard Gauge – 1435mm
- Signaling: DS-ATC
- Train Capacity: 750 passengers
- Traction: 25 KV AC overhead catenary (OHE)
- Safety: Urgent Earthquake Detection and Alarm System (UrEDAS) for automatic breaking in case of an earthquake
Chennai – Mysore HSR Route Information
- Length: 463 km
- Type: Elevated, Underground & At-Grade
- Number of Stations: 11
- Station Names: Chennai, Poonamallee, Chittoor, Kolar, Kodahalli, Whitefield, Byappanahalli (Bengaluru), Electronics City, Kengeri, Mandya and Mysuru
Chennai – Mysore HSR Route Map
Route Description: The proposed Chennai – Mysore High Speed Rail Corridor is planned to run along major expressways, national highways, greenfield areas, and may pass through arterial roads of the intermediate city road network for high speed rail connectivity between different cities along the corridor.
Alignment and location of stations displayed below are purely indicative just to give an idea of how the line might look like.
An official PDF route map of the Chennai – Mysore HSR line will be added here when available.
Chennai – Mysore HSR Fares (Prices)
The fare structure is yet to be finalized but is expected to be 1.5 times the existing first class AC fare on the Indian Railways’ current service. The line’s official fare structure, prices and rules are expected to be finalized closer to the start of commercial operations.
Chennai – Mysore Tenders
Latest NHSRCL Chennai – Mysore High Speed Rail tender notices can be viewed on NHSRCL’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.
Major Contractors
Contract | Contractor |
Data Collection and Associated Survey Work for DPR | Highway Engineering Magnitude Consortium is lowest bidder among 4 |
Carrying Out Ridership Study (Traffic Study) | PK Engineers is lowest bidder among 4 |
Preparation of GADs (General Alignment Drawings) | Translink Consultants |
Final Alignment Design including Aerial LiDAR Survey | Aarvee Associates Architects Engineers Consultants Pvt. Ltd. – GSL Associates Pvt. Ltd. is lowest bidder |
Survey, Identification of Overhead, Over Ground, Underground Utilities And Identification Of Power Sourcing Options for Substations | Subudhi Technoengineers Pvt. Ltd. |
Detailed Social Impact Assessment (SIA) Report and Resettlement Action Plan (RAP) | Overseas Min-Tech Consultant is lowest bidder |
Environment Impact Assessment (EIA) Report | Bids re-invited in January 2022 (Overseas Min-Tech Consultant was lowest bidder in original round) |
Click on ‘News & Construction Updates’ below for project news, progress and updates.
Menu: News & Construction Updates | Mumbai – Ahmedabad HSR | Delhi – Varanasi HSR | Delhi – Ahmedabad HSR | Mumbai – Nagpur HSR | Delhi – Amritsar HSR | Mumbai – Hyderabad HSR | Chennai – Mysore HSR | Varanasi – Howrah HSR
Page last updated: October 21, 2024. Have a question or spot an issue? Let me know here.