DRA & MEIL Awarded Khammam – Vijayawada Expressway’s Work

Dineshchandra R Agrawal Infracon and Megha Engineering and Infrastructures on Friday were awarded 3 contracts for 89.43 km Khammam – Vijayawada Expressway (NH-163G) of the 405 km Nagpur – Vijayawada Economic Corridor in Telangana and Andhra Pradesh.

DRA Infra was issued a Letter of Award (LOA) for Package 1 valued at Rs. 747 crore, while MEIL was issued 2 LOAs for packages 2 & 3 valued at Rs. 662.66 crore and 745.83 crore respectively.

This new 4 lane access-controlled highway by National Highways Authority of India (NHAI) will have a mix of greenfield and brownfield-upgraded sections with an alignment passing by Adilabad, Mancherial, Warangal and Khammam.

Construction of its Khammam – Vijayawada greenfield corridor will be carried out via 3 civil packages under the Bharatmala Pariyojana Phase-I program with a goal to improve the efficiency of freight movement and boost exports via port connectivity.

NHAI had invited tenders for all 3 packages’ civil construction by hybrid annuity model (HAM) in December 2022 with a 2 year deadline. Technical bids were opened in mid-March to reveal 9 bidders. Financial bids were opened on March 27.

Package 1

Scope: V.Venkatayapalem village at Design Ch.220.480 Km to Brahmanapalli(K) village at Ch. 250.400

FirmBid (Rs. Crore)
Dineshchandra R Agrawal Infracon Pvt. Ltd.747,00
G R Infraprojects Ltd.822.67
HG Infra Engineering Ltd.835.11
KNR Constructions Ltd.842.00
Oriental Structural Engineers Pvt. Ltd.843.60

Package 2

Scope: Brahmanapalli(K) village at Design Ch. 250.400 Km to Remidicherla village at Ch.280.200 Km

FirmBid (Rs. Crore)
Megha Engineering and Infrastructures Ltd662.66
Kalyan Toll Infrastructure Ltd.692.00
G R Infraprojects Ltd697.57
KNR Constructions Ltd.744.00
HG Infra Engineering Ltd.754.00

Package 3

Scope: Remidicherla village at Design Ch.280.200 Km to Jakkampudi village (on NH-16) at Design Ch. 309.909

FirmBid (Rs. Crore)
Megha Engineering and Infrastructures Ltd.745.83
Dineshchandra R Agrawal Infracon Pvt. Ltd.747.00
Kalyan Toll Infrastructure Ltd.773.00
G R Infraprojects Ltd.775.00
HG Infra Engineering Ltd.790.11
Khammam – Vijayawada Expressway’s route – via the government’s EC site

Back in March, MEIL had won Nagpur – Vijayawada Economic Corridor’s 112 km Mancherial – Warangal Expressway’s work in Telangana.

A complete list of Nagpur – Vijayawada Economic Corridor’s packages, their contractors and status can be viewed here.

For more updates, check out the Expressway section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

3 Responses to "DRA & MEIL Awarded Khammam – Vijayawada Expressway’s Work"

  1. Navneet yadav says:

    Please correct the map. As a blog writer one should take utmost care in checking the facts and pictures before posting online

    Reply
  2. Narayanan Subramaniam says:

    Thanks for sharing, not only this page, you are doing excellent job.

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *