Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates
Menu: News & Construction Updates | Overview | Phase 1 Info | Phase 2 Info | Phase 3 Info
Phase 2 Information
28.254 km Ahmedabad Metro Phase 2 project with 2 corridors was approved by India’s Central Government’s Cabinet on February 19, 2019 at a total estimated cost of Rs. 5384.17 crores. Its foundation stone was laid by the Prime Minister Narendra Modi on March 4, 2019.
Phase 2 envisions a north extension of Line-2 from Motera Station to Mahatma Mandir in Gandhinagar. A notice inviting bids for its civil construction was published in January 2020, technical bids were opened in June 2020, and construction work started in February 2021.
A 20.8 km section of the 28.25 km Ahmedabad Metro Phase 2 project was inaugurated by PM Modi on September 16, 2024 connecting Motera – Sector-1 and GNLU-GIFT City (spur line).
Ahmedabad Metro Phase 2’s DPR (Detailed Project Report) in PDF format can be viewed here.
A roughly 5 km line connecting Koteshwar Road – Sardar Vallabhbhai Patel International Airport (spur of Red Line) was proposed to be included in Phase 2 plans, but has now been included in Phase 3.
Key Figures
Operational: 20.8 km | Under Construction: 7.45 km
- GMRC’s Current Phase 2 Deadline: Not Revealed
- My Completion Estimate: Q1 2026
Ahmedabad Metro Phase 2 Routes (Operational)
Line-2 (North-South / Red Line): Motera Stadium – Gandhinagar Sector-1
- Length: 15.4 km
- Type: Elevated
- Number of Stations: 6
- Station Names: GNLU, Raysan, Randesan, Dholakuva Circle, Infocity, Sector-1
Line-3 (Eastern Spur): Gujarat National Law University – Gujarat International Finance Tec-City (GNLU – GIFT City)
- Length: 5.416 km
- Type: Elevated
- Number of Stations: 3
- Stations Names: Gujarat National Law University (GNLU), Pandit Deendayal Petroleum University (PDPU) and Gujarat International Finance Tec-City (GIFT City)
Ahmedabad Metro Phase 2 Routes (Under Construction)
Line-2 (North-South / Red Line): Gandhinagar Sector-1 – Mahatma Mandir
- Length: 7.45 km
- Type: Elevated
- Depot: Indroda (construction hasn’t started)
- Number of Stations: 14
- Station Names: Koteshwar Road, Vishwakarma College, Tapovan Circle, Narmada Canal, Koba Circle, Juna Koba, Koba Gam, Sector-10A, Sachivalaya, Akshardham, Juna Sachivalaya, Sector-16, Sector-24 and Mahatma Mandir
Ahmedabad Metro Phase 2 Route Map (By Line)
The embedded maps below shows the locations of all stations (Phase 1 – exact & Phase 2 – tentative) and can be zoomed into!
An official PDF route map of Ahmedabad Metro’s Phase 2 will be added here when available.
Ahmedabad Metro Phase 2 Route Map (By Phase)
Key: Phase 1 (Operational) | Phase 2 (Under Construction)
Project Video
Ahmedabad Metro Tenders
Latest GMRC Ahmedabad Metro Phase 2 tender notices can be viewed on the GMRC’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.
List of Major Contractors
Contract | Contractor |
GEC: Ahmedabad Metro Phase 2’s General Engineering Consultant | RITES – Nippon Koei – Oriental Consultants JV |
DDC: Detailed Design Consultant for extension of Line-2 from Motera Stadium to Mahatma Mandir | SYSTRA – SYSTRA MVA Consulting (India) Pvt. Ltd. JV |
DDC: Detailed Design Consultant for Power Supply & Distribution System, 750 V DC Third Rail Traction Electrification and SCADA System | Ardanuy Ingeniería S.A |
Geotechnical Investigation: Line-2 Extn (Viaduct, 22 Stations & Depot) | M K Soil Testing Laboratory |
Civil Package C1: Viaduct from Motera to GNLU (8.124 km) and GNLU to GIFT City (5.420 km) with 10 stations | Afcons Infrastructure |
Civil Package C2: Viaduct from GNLU to Gandhinagar Sector-1 (6.478 km) with 5 stations | Ranjit Buildcon |
Civil Package C3: Viaduct from Sector-1 to Mahatma Mandir with 7 stations | Dilip Buildcon is lowest bidder |
Rolling Stock Package RS3: 30 Coaches | Titagarh Wagons |
Signaling Package SIG-03: Communications based train control (CBTC) | Nippon Signal – Nippon Signal India JV |
Electrification Package EP2: 750 V DC Third Rail | Siemens – RVNL JV |
Track-work Package: Design, Supply, Installation, Testing and Commissioning of Ballastless Track | VNC – KEC – Emrail JV |
Tracks: 9116 MT of Head-Hardened Rails | Jindal Steel & Power Ltd. (JSPL) |
Tracks: 788 MT UIC 60/60E1 R260 Grade Rails | Jindal Steel & Power Ltd. (JSPL) |
Tracks: UIC 60/60E1 Turnouts | Voestapline VAE VKN India |
Telecommunications System Package TEL-03 | Larsen & Toubro |
Click on ‘News & Construction Updates’ below for project news, progress and updates.
Menu: News & Construction Updates | Overview | Phase 1 Info | Phase 2 Info | Phase 3 Info
Page last updated: September 17, 2024. Have a question or spot an error? Let me know here.