T58 – 2nd TBM for Mumbai Metro Line-3 Arrives at Mumbai Port
Parts of TBM T58, a Ø6.68m dual-mode tunnel boring machine, made a touch-down…
Parts of TBM T58, a Ø6.68m dual-mode tunnel boring machine, made a touch-down…
Update: The inspection has been pushed to September 25-26. The final round…
A consortium of India’s Hindustan Construction Company and UAE’s…
During the launch event for the 508 km Mumbai and Ahmedabad high-speed rail…
This news marks an excellent time for me to start tracking the 508 km Mumbai…
A consortium of LKT Engineering Consultants Ltd. and Architect Hafeez Contractor has…
Four coaches belonging to the 7th new Alstom Metropolis train-set for Lucknow…
The Bangalore Metro Rail Corporation Ltd (BMRCL) yesterday revealed an updated…
During the recent inspection of Nagpur Metro Line-1’s Khapri Depot by…
The Mumbai Metropolitan Region Development Authority (MMRDA) has invited bids…