India’s Largest TBM Arrives for Mumbai’s Coastal Road Project
India’s largest tunnel boring machine (TBM) with diameter of 12.19m arrived…
India’s largest tunnel boring machine (TBM) with diameter of 12.19m arrived…
This is a deviation from my posts on metro construction, but right up my alley….
Commencement date of metro operations along with current operational length:
• Kolkata: 24 October 1984 – 58.7 km
• Delhi: 24 December 2002 – 353.3 km
• Bangalore: 20 October 2011 – 75.2 km
• Gurgaon: 14 November 2013 – 12.1 km
• Mumbai: 8 June 2014 – 59.2 km
• Jaipur: 3 June 2015 – 12 km
• Chennai: 29 June 2015 – 54.1 km
• Kochi: 19 June 2017 – 27.9 km
• Lucknow: 6 September 2017 – 22.9 km
• Hyderabad: 29 November 2017 – 67 km
• Noida-Gr. Noida: 25 January 2019 – 29.7 km
• Ahmedabad: 6 March 2019 – 60.7 km
• Nagpur: 8 March 2019 – 38.2 km
• Kanpur – 29 December 2021 – 8.7 km
• Pune: 6 March 2022 – 31.2 km
• Navi Mumbai: 17 November 2023 – 11.1 km
• Agra: March 6 2024 – 5.2 km