L&T’s TBMs Pass Through Mumbai Metro’s Hutatma Chowk Station
After recording breakthroughs in October by Surya-2 and November by Surya-1, Larsen & Toubro – Shanghai Tunnel Engineering Company (L&T – STEC) JV has started moving both tunnel boring machines through Hutatma Chowk Station on Mumbai Metro’s 33.5 km Aqua Line (Line-3).
Both of these Robbins Crossover XRE TBMs, with a 6.65 meter diameter, have just one more tunneling assignment left and that is to complete the twin tunnels towards Chhatrapati Shivaji Terminus (CST) – a distance of 551m on the up-line tunnel and 556m on the down-line tunnel.
While Surya-1 on the up-line is being dragged through the station’s 233m cut & cover box using hydraulic jacks towards its northern-end, Surya-2 on the parallel down-line is tunneling through the station’s NATM-mined tunnel – generating the most unique tunneling sight in India. I really hope either one of Robbins, L&T or Mumbai Metro Rail Corporation (MMRC) is filming a time-lapse as it moves through.
More on details on the unique Hutatma Chowk Station can be viewed here.
After Surya-2 passes through Hutatma Chowk Station’s vicinity, workers will dismantle the tunnel rings built by it. What you’re seeing above and below is the station’s future down-line platform area.
Surya-1 is scheduled to be recommissioned towards CST Station by mid January. Here’s a status of package UGC-01 between Cuffe Parade and CST stations where 2 breakthroughs are pending. This table is best viewed on a desktop device –
TBM | Line | From | To | Distance | Status |
1 | Up | Cuffe Parade | Vidhan Bhavan | 1128m | Completed |
1 | Up | Vidhan Bhavan | Churchgate | 498m | Completed |
1 | Up | Churchgate | Hutatma Chowk | 649m | Completed |
1 | Up | Hutatma Chowk | CST | 551m | Yet to Begin |
2 | Down | Cuffe Parade | Vidhan Bhavan | 1254m | Completed |
2 | Down | Vidhan Bhavan | Churchgate | 481m | Completed |
2 | Down | Churchgate | Hutatma Chowk | 653m | Completed |
2 | Down | Hutatma Chowk | CST | 556m | Yet to Begin |
For more updates, check out the Mumbai section of The Metro Rail Guy!
– TMRG
❤️
Nice. Appreciate your interest and enthusiasm — and your kindness in sharing updates with the aam aadmi! Keep it up.
Thanks! Messages like these keep me going.
Any news on when Hutatma Chowk to CST will begin?
Don’t know about about Surya-2, but mid-Jan for Surya-1
Please make trial runs of metro 3 originating from sidhinnayak temple ganpati Napa will remove all hurdle like metro shed