Krishna Wins Delhi-Dehradun Expressway Haridwar Spur’s Work

Krishna Constellation Pvt. Ltd. on Wednesday emerged as the lowest bidder to construct the 50.7 km Haridwar Spur of the 210 km Delhi – Saharanpur – Dehradun Expressway project.

This six-lane access-controlled highway will have its eastern end just south of Saharanpur, pass north of Roorkee, and then terminate at the proposed Haridwar Ring Road project. India’s union government approved its construction in mid-November with a budget of Rs 2,095 crore.

The project’s Detailed Project Report (DPR) was prepared by Transys Consulting Pvt. Ltd. in 2020.

National Highways Authority of India (NHAI) invited tenders for its construction in August with a 2 year deadline and Rs 1,237.95 crore estimate. Technical bids were opened in November to reveal 14 bidders.

Financial Bid Values (lowest 5)

FirmBid (Rs. Crore)
Krishna Constellation1359.32
Megha Engineering1389.29
Gawar Construction1434.36
IRCON International1458.99
CDS Infra Projects1460.91

Brief Scope: Development of a six-lane access-controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor near Halgoya village in the state of Uttar Pradesh traverses through northern side of Roorkee and merges with NH-334 (Old NH No. 58) at existing km 182+070 (design chainage 43.900) near Badheri village and Uttarakhand on hybrid annuity mode under Bharatmala Pariyojana.

Alignment of Haridwar Spur (in green) from the government’s land acquisition portal; Delhi-Saharanpur Expressway is shown in blue and Haridwar Ring Road in Orange

Krishna’s bid of Rs. 1359 crore was 9.8% higher than NHAI’s estimate which is within their permissible limit, so a contract should be awarded in the coming weeks.

I hear financial bids for Delhi – Dehradun Expressway Phase 2’s 27 km Package 1 were also opened on Wednesday. If anyone has its results, leave a comment below or shoot me a message using the contact page.

Details on the Delhi-Dehradun Expressway along with a list of all packages and their status can be viewed here.

For more updates, check out the Expressway section or my Home Page!

– TMRG

written by

Global traveler who prefers mass rapid transit

19 Responses to "Krishna Wins Delhi-Dehradun Expressway Haridwar Spur’s Work"

  1. RAHUL SINGH says:

    I Rahul singh . i have 16 years exp. In public limited construction company as Purchaser .

    Reply
  2. Rakshpal singh says:

    Hi
    I am rakshpal singh from bareilly .can i meet you for soil dumping

    Reply
  3. Ravi Verma says:

    I have already rs 18 cr earth work . You can consider my firm for the up

    coming work

    Reply
  4. P.C.YADAV says:

    Kanpur se Lucknow elevated expressway konsi company ne jita hai pls confirm us

    Reply
  5. Shambhu Prasad Mishra says:

    My company madhu india international laision and contract consultant msme registered womens prop ship company in delhi ncr govt works exported food product’s will helpful for highways and bridge designer for many projects like food parks if you need any professional experiences and can give you better management system in your organisation by skill development and pmc advisor done by my company .we have completed for industrial revolution with you and discussing further information about me and your requirements can be done by my company .Good morning spmishra retired construction consultancy services provider to various purposes

    Reply
  6. Narinder Pal Agnihotri says:

    I have lot of experience in motor/expressways as an angineer abroad in Kuwait can give services if considered

    Reply
  7. Shree Govind Borewell co says:

    I am Pilling work

    Reply
  8. Anas says:

    Please give me information about Krishna construction. Like his HR number or any mail address?

    Reply
    • Anuj Kumar Geherwal says:

      For any work related queries at Krishna Constellation Pvt Ltd you can contact me at 8171984952

      Reply
      • Aranibhash Gupta says:

        Sir I request some information regarding Haridwar Spur project of Delhi Dehradun Greenfield expressway project for back to back/Subcontract work

        Reply
  9. Mehtab Rana says:

    Main ek Chhota sa contactor hun aur kisi bhi labour ke kam ko karne mein saksham hun atah meri aapse request hai prathna hai ki koi bhi manpower ka kam ho mitti bhara Ho gaon se gana Ho ya CC PC vagaira please mujhe bhi kam dijiye

    Reply
  10. Mehtab Rana says:

    Kisi bhi thekedar ko manpower labour ki jarurat Ho jbc dumper ki Jaise ghas gana road ke barabar mein donon taraf CC ya PC ka koi karya ke liye mujhse sampark Karen 9594 10 31 81

    Reply
  11. Ajay kumar says:

    Me Ajay kumar
    Me contractor hun mujhe kam ki jarurat hai please kam ho to plz btay
    6397467503
    9058321539

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to TMRG Cancel reply

Your email address will not be published. Required fields are marked *