4 Bidders for Amas – Darbhanga Expressway’s Construction Work

4 construction firms have submitted a total of 7 bids to construct the 55.002 km Package-1 and 54.322 km Package-2 of the 230 km Amas – Darbhanga Expressway (NH-119D).

This 4 lane access-controlled highway by National Highways Authority of India (NHAI) will become the first expressway in Bihar state. It will run in north-south orientation to link the outskirts of Aurangabad – Gaya – Patna – Darbhanga, and use portions of the under construction Patna Outer Ring Road and 9.75 km Kachchi Dargah – Bidupur Bridge projects.

Package 1 will connect Amas (Km 0.0 on NH-02) with Shivrampur (Km. 55.002), while Package 2 connects Shivrampur with Ramnagar (Km. 109.324) in South Bihar.

NHAI invited tenders for their construction in October 2021 with a 2 year deadline and Rs. 996.70 crore and Rs. 1004.98 crore estimates. Technical bids were opened on Friday.

Bidders:

  • Megha Engineering and Infrastructures Ltd.
  • PNC Infratech Ltd. (Package 1 only)
  • Ram Kripal Singh Construction Pvt. Ltd.
  • Vishwa Samudra Engineering Pvt. Ltd.

Brief Scope of Package 1: Construction of Four Lane Access Controlled Greenfield NH from Amas (on NH-02) (Ch.00.000) to village Shivrampur (Ch.55.002) at (NH-119D) under BMP in Bihar (Amas-Darbhanga package-I of 55.002 km) on HAM.

Brief Scope of Package 2: Construction of Four lane access controlled Greenfield NH from Shivrampur (Ch. 55.002 Km) to Ramnagar (Ch. 109.324 km), at NH-119D under BMP in Bihar- (Amas Darbhanga PKG-II of 54.322Km) on HAM.

Package 1’s alignment between Amas – Shivrampur (via NHAI’s tender docs) – view project information

The bids have now been sent for technical bid evaluation which can take a couple months to complete. When that is done, the financial bids of the technically qualified bidders will be opened to reveal who’s the lowest bidder and most likely contractor.

In the future, this expressway will be extended from Darbhanga to Jaynagar on the India-Nepal border. Design details and a list of all civil packages & their status can be viewed here.

For more updates, check out the Expressway section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

21 Responses to "4 Bidders for Amas – Darbhanga Expressway’s Construction Work"

  1. Fav says:

    Hey TMRG,
    Is the chennai metro lite plan is dropped to build metro?
    Why they did not prepare detailed feasibility report till now they started it in February 23 2019 but still they did not finish any reasons TMRG?

    Reply
  2. Fav says:

    Hey TMRG
    When is Madurai metro Feasibility report financial bid opening? Did they announce ?

    Reply
  3. Fav says:

    Hey TMRG
    Is Coimbatore metros detailed project report is finished for that 136 km ?pls update

    Reply
  4. Fav says:

    Hey TMRG
    Chennai metro rail limited appointed consultant to merge chennai mrts with chennai metro and the southern railways said if they build 4th track between chennai beach and chennai egmore they will give the whole mrts network to chennai metro your thoughts TMRG?

    Reply
  5. Fav says:

    Hey TMRG
    When do you think they will approve chennai airport to kilambakkam extension of metro will it take 2 months minimum? Your thoughts TMRG?

    Reply
  6. Fav says:

    Hey TMRG
    The chennai metro appointed Aecom company to prepare metro extension from poonamalle to thirumazhisai satellite township which is 4km, the officials told that they will prepare detailed project report in 6months this news was on 4 January 2021.Your thoughts TMRG?

    Reply
  7. Fav says:

    Hey TMRG
    If chennai metro rail awarded all civil contracts for phase 2. Will they immediately start chennai metro phase 3 feasibility report?Your thoughts TMRG?

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Fav Cancel reply

Your email address will not be published. Required fields are marked *