ST Only Bidder for Chennai Metro Line 3 & 5’s Platform Screen Doors

May 6, 2023 Update: CMRL has cancelled the tender

February 19, 2023 Original Post: Singapore’s ST Engineering Electronics Ltd. is the only bidder for Chennai Metro Line 3 & 5’s Platform Screen Door contract (Package ASA12) after Chennai Metro Rail Ltd (CMRL) opened technical bids on Saturday.

Both these under construction lines of 118.9 km Chennai Metro Phase 2 project will run in a north-south orientation to connect Madhavaram – SIPCOT (45.813 km Line-3) and Madhavaram – Sholinganallur (47 km Line-5) with a mix of elevated & underground stations.

Platform screen doors (PSDs) with half-height will be installed at all elevated stations for enhancing passenger safety with primary goals to prevent suicides & accidents during passenger movement.

The scope of this contract includes Line-3’s 10 elevated stations between Sholinganallur Lake – SIPCOT 2, awarded to RVNL in January 2023, and Line-5’s 29 elevated stations between Grain Market – Elcot which are under construction by HCC – KEC JV and Larsen & Toubro.

CMRL’s official Phase 2 map with my edits showcasing Line-3’s stations between Sholinganallur Lake – SIPCOT 2 – view Phase 2 info & route map

Chennai Metro Rail Ltd (CMRL) had invited tenders for this contract in October 2022 with an unknown estimate and 1965 day deadline.

Brief Scope: Design, Manufacture, Supply, Installation, Testing and Commissioning of Platform Screen Doors for Corridor 3 (Sholinganallur Lake to Sipcot 2) and Corridor 5 (Grain Market to Elcot) of CMRL Phase II.

Representational only: Half-height platform screen doors at Mumbai Metro’s new Red Line – Photo via Darshil Parmar

Whether CMRL is satisfied or not with receiving just 1 bid remains to be seen. If they aren’t, then this will head to a retender. If they are, then ST’s technical bid will be evaluated for the next steps in the tendering process.

Back in October, CMRL had received 4 bids for Line-4’s PSD contract. Financial bids were opened in mid-January and the winner remains unknown to me. If someone reading this is aware, then drop a comment below or send me a message using the Contact Page.

A list of all Chennai Metro Phase 2 civil & system packages and their status can be viewed here.

For more updates, check out the Chennai section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *