L&T Launches Chennai Metro Line-5 CP-10-EV-03’s 1st U-Girder
Larsen & Toubro on Thursday morning launched their 1st pair of U-girders for Chennai Metro Line-5’s 10.2 km CMBT – Venugopal Nagar section (Package CP10-EV-03)
This package-level milestone was recorded on top of piers P184 – P185 at Shastri Nagar using 25m long U-girders weighing approximately 150 MT each.
Chennai Metro Rail Ltd (CMRL) had awarded L&T with 118.9 km Chennai Metro Phase 2 project’s Rs. 1590 crore contract for Package CP10-EV-03 in November 2021 with a 36 month deadline.
The firm had cast their first U-girder at Karanodai Casting Yard (view on Google Maps) in July 2022 from where I estimate approximately 720 girders will be cast.
L&T’s package consists of 1 underground (Venugopal Nagar) and 11 elevated stations at the northern-end of the 47 km Line-5 which will connect Madhavaram – Sholinganallur through 48 stations.
It consists of 2 disjointed sections on either side of the underground Package UG6 (Kolathur – Nathamnuni) for which re-bidding is currently underway with a submission deadline of May 2, 2023.
The two sections and other infra in their scope includes:
- CMBT to Nathamuni Ramp – 5 stations at CMBT, Kaliamman Koil Street Junction, Kendriya Vidyalaya, Thirumangalam & Anna Nagar Depot
- Retteri Ramp to Venugopal Nagar – 7 stations at Retteri Junction, Shastri Nagar, MMBT, Velmurugan Nagar, Manjambakkam, Assisi Nagar & Venugopal Nagar (underground)
- 1.5 km depot-line to lines 3 & 5’s Madhavaram Depot under construction by URCC
- Cut & cover section between Assisi Nagar Ramp and Venugopal Nagar
For more updates, check out the Chennai section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.
– TMRG
If someone wants to go from Ponnamallee to Chennai Central, how to reach through Metro..?
Poonamallee to Vadapalani or nandanam, then change to green line or blue line respectively
One option would be to go till vadapalani and then catch a metro to central
Thought Kolathur to Nadhamuni tender deadline is in the end of March🤧.. they extended again??
31st march they will open tenders for Kolathur to Nadhamuni UGC06
Moved again. Submission deadline is now May 2 and opening on May 3.
Hey TMRG, do you know the exact reason behind the postponement of deadlines?
The adaptability of WDC Quantify Limited’s strategies is unparalleled. They pivot seamlessly to changing market conditions, ensuring consistent results.