Bids Invited for Kanpur Metro Agriculture University Depot’s Contract KNPCC-14
Uttar Pradesh Metro Rail Corporation (UPMRC) on Monday invited bids for the civil construction and system installation work at Kanpur Metro Phase 1 project’s Agriculture University Depot & Workshop (Package KNPCC-14).
This train maintenance facility will be built on a 37.69 acre parcel within Chandra Shekhar Azad University of Agriculture & Technology. It will house an undisclosed number of 3 coach Alstom MOVIA train-sets for Kanpur Metro’s 8.38 km Line-2 which will connect Agriculture University – Barra-8) via 8 stations.
The depot will be connected to the main-line via 4.3 km Package KNPCC-12’s 557.8m northern section (Ramp – Agriculture University) for which bidding is underway.
- Deadline: 18 months
- Estimated Cost: Rs. 113.20 Crore
- Pre-bid Meeting: November 23, 2023 at 3 PM
- Bid Submission Deadline: December 11 at 3 PM
- Technical Bid Opening: December 13 at 3 PM
UPMRC’s Brief Scope: Civil, PEB and E&M works for construction of depot cum workshop, including structural, architectural, plumbing, drainage, external development, road works, electrical, mechanical, VAC, fire fighting, fire detection etc. at Agricultural University Kanpur for Agricultural University to Barra-8 Corridor-2 of Kanpur Metro
Kanpur Metro’s Line-2 is an extremely short line, so I imagine UPMRC will stable only 8-10 train-sets at this depot.
This is the 3rd and final civil package for Line-2’s construction. Overall, it’s the 8th and final civil tender notice for Kanpur Metro Phase 1’s mainline and depots.
See a list of all Phase 1 packages (civil & systems) and their status over here.
For more updates, check out the Kanpur section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.
– TMRG
Kanpur metro station me job karna hai vceceny Khali hai sir ji
Mujhe pata nahi hai. Aap UPMRCL se puchhiye.
Could you please provide a clear photo of depot site plan.
Below the site plan image, I’ve now included a link to a larger resolution pic.
Kya bhauti kanpur Nagar and kisan Nagar and raniya industrial area ke liy bhi metro banegi
City se Bahar bhi nikalo metro ko ki city ke andar hi nachate rahoge aap log jaha se log private job Kar sake Dada Nagar , thumbs-up Tiraha, namak factory chauraha panki padav ,bhauti, raniya
Siddiq ahmad ISO LEAD AUDITER 45001 2018 OHSMS ISO 14001 2015 environment ISO 9001 2015 QMS
Kalpa taru
Matro rail kanpur
TMRG Are you Sure that Agricultural university stn will be elevated? Because based on distance and close proximity to the Depot, that stn should be built at grade