Kanpur Metro’s 1st Crossover Cast at IIT Kanpur Station

Larsen & Toubro on Monday night cast the first of three track crossovers for Kanpur Metro’s 8.728 km priority corridor (IIT Kanpur – Motijheel) just west of IIT Kanpur Station.

When the first section of the 23.785 km Line-1 (IIT -Naubasta) becomes operational in early 2022, this crossover along with the ones at Geeta Colony Station, connecting to Polytechnic Depot, and Motijheel Station will enable the system’s Bombardier (now Alstom) train-sets to guide from one track line to another.

Larsen & Toubro was awarded Kanpur and Agra metros’ track-work contract (Package KNPAGT-3) in February with a combined value of INR 3,63,68,64,879 and Euro 30,61,550. The turnouts for this crossover were supplied by Voestalpine VAE VKN India through a Rs. 64.52 crore contract (Package KNPAGT-2) awarded in September 2020.

Priority Section of Kanpur Metro’s Line-1 – view Kanpur Metro map & information

Some snaps by UPMRC:

view on Tuesday morning

Here’s a video with UPMRC’s MD celebrating the start of systems work, which includes track, signaling & traction. Claims COVID-19 has affected work, but UPMRC, General Consultant (TYPSA-Italferr) and various contractor teams are focused on meeting the targets set. In the past, they’ve aimed to start trial runs in November 2021.

For more updates, check out my Home Page!

– TMRG

written by

Global traveler who prefers mass rapid transit

7 Responses to "Kanpur Metro’s 1st Crossover Cast at IIT Kanpur Station"

  1. U says:

    TMRG tomorrow East-West Metro(Line 2) of Kolkata Metro will have its tunnelling complete
    Here’s an article from Times of India
    https://m.timesofindia.com/city/kolkata/urvi-left-with-less-than-30m-tunnelling/amp_articleshow/82558919.cms

    Reply
    • TMRG says:

      Thanks – looking forward! I hear 3 more rings are pending. Breakthrough depends on manpower at shaft.

      Reply
  2. Abhishek says:

    Hi.. I think kumar keshav was earlier associated with DMRC. Is thats so???

    Reply
  3. Hh says:

    Afcons underground tunnels work of rrts delhi meerut what happened

    Reply
    • TMRG says:

      Haven’t heard or seen reports of ground work starting. I’m sure it has though.

      I hear Afcons has ordered 4 TBMs from Terratec.

      Reply
  4. Saurabh rai says:

    Kanpur metro construction work.is going very good under in Mr kumar keshav sir
    Congratulations to all team

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *