SYSTRA-RITES-DB JV Wins Hyderabad Metro Airport Line’s General Consultant Contract
SYSTRA – RITES – DB Engineering JV has been declared as the preferred bidder for the General Consultant (GC) contract of Hyderabad Metro’s 31 km Airport Express Line.
This semi high-speed rail line will connect Mindspace Junction with Rajiv Gandhi International Airport via 10 stations and be developed under Hyderabad Metro’s Phase 2 project by Hyderabad Airport Metro Ltd (HAML).
Per HAML’s MD’s tweet last night, SYSTRA – RITES – DB consortium recorded the highest technical score and also placed the lowest financial bid at Rs. 98.54 crore to beat 4 other consortia for the GC contract.
HAML had invited expression of interest (EOI cum RfQ) in December 2022 with a 36 month assignment period which received applications from 5 consortia. In January 2023, the same 5 bidders were invited to submit bids in the the RfP (Request for Participation) round.
I don’t have technical scores, financial bid values or final total scores of all bidders. If someone does, then leave a comment below or shoot me a message via the Contact page. I’d like to add it in here for record keeping.
Bidder Recap
- AECOM India + Egis Rail + Egis India
- Ayesa + Nippon Koei + Aarvee Associates
- Consulting Engineers Group + Korea National Railway
- SYSTRA + RITES + DB Engineering
- TYPSA + PINI Group
This mostly elevated line along Hyderabad’s Outer Ring Road (ORR) will run on an elevated viaduct for 28.5 km and underground for 2.5 km at the airport within Hyderabad Aerocity. It is expected to cover the distance from Gachibowli in the city to RGIA in 20 minutes with trains operating at a maximum speed of 120 kmph.
10 stations (9 elevated & 1 underground) will be built at Mindspace, Raidurg, Biodiversity, Nanakramguda, Narasingi, TSPA Junction, Rajender Nagar, Shamshabad Junction, Airport Cargo and RGIA Terminal (only underground station).
SYSTRA – RITES – DB’s assignment is expected to speed up the line’s implementation through assistance in design, supervision, safety, quality control and contract management. Their first task will be to prepare construction tender documents for selecting the line’s civil contractors.
For more updates, check out the Hyderabad Metro section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.
– TMRG
Hat-tip: @phoenixnfalcon on Twitter
Latest NHAI PROJECTS
Hi, I haven’t heard of any major expressway related news in the past 2 weeks. Will definitely share results if bids for any ongoing projects are opened
It is happy for Hyd airmetro express project consultancy. Simultaneously the MMTS extension from Umdednagar to Shamshabad Airport distance of 5 kms is give better way of transportation facility to reach air port directly. Kindly think & motivate .
When will expect construction companies bids
Those are all big companies in their own. No wonder they had the highest score.
What is the actual route for this new airport metro as there is no open space or from raidurgam to bio diversity circle. Also if they move the metro connectivity towards right-side of IKEA there we have all Residencial societies and school, not sure how they will connect raigduragm to biodiversity/khajaguda lake.
Metro line from High-tech City to RGIA best root for employees and must be planned station at Rallaguda junction
Can you please show the metro path from Rai Durgam to Biodiversity to Nanakram guda