RITES-SMEC Wins Haryana Orbital Rail Corridor’s GC Contract

February 26 Update: HRIDC has awarded RITES – SMEC JV HORC’s General Consultant contract with a final contract value of Rs. 60,97.79.000 + GST, and 72 month deadline including one year of O&M period.

February 12 Original Post:

RITES – SMEC JV emerged as the lowest bidder for the 121.742 km Haryana Orbital Rail Corridor (HORC) project after Haryana Rail Infrastructure Development Corporation Ltd (HRIDC) opened financial bids on February 2.

Passenger trains on this new broad gauge semi high-speed rail line, approved by the Central Government in mid-September 2020 with an estimated cost of Rs 5,617 crore, will operate at a top speed of 160 kmph and provide connectivity through 17 stations along the Kundli – Manesar – Palwal (KMP / WPE) Expressway. Along with spur/link lines, the project’s total length is approximately 144 km.

HRIDC had invited EOI applications in mid-July 2020, received 14 applications in September, rejected 8 applications in November and then invited bids from 6 shortlisted applicants. Technical bids were opened on December 16 and financial bids were opened on February 2.

Financial Bid Values (Lead Bidders):

FirmBid
RITES – SMEC JVRs. 60.98 crore
AECOM AsiaRs. 79.14 crore
AYESARs. 89.63 crore
SYSTRARs. 105.77 crore
Tecnica y Proyectos SARs. 130.67 crore
ILF Consulting Engineers AustriaDisqualified

Ultimately RITES-SMEC’s selection was made on the Quality-Cost Based Selection (QCBS) method through a combination of points scored in technical bid and financial bid evaluation.

Contract: HORC/GC/2020/01

Title: General Consultancy Services for Haryana Orbital Rail Corridor (HORC) From Palwal to Sonipat via Sohna, Manesar and Kharkhoda in the State of Haryana.

Brief Scope: The objective of the consulting services (the “Services”) is to provide General Consultancy Services for successful planning, basic & detailed designs, preparation of specifications, preparation of proposal documents and tender assistance, checking designs, project management and supervision including construction supervision, safety, quality and environmental management, interface management, testing and commissioning of the Haryana Orbital Rail Corridor (HORC) (the “Project”). The planning shall include O&M phase as well.

Route of the Haryana Orbital Rail Corridor project (in red) – view HORC Project Info & Map

This contract will be financed by the Asian Infrastructure Investment Bank (AIIB), which in June 2020 cleared a loan concept to lend $400 million for its development.

This new rail corridor aims to bypass Delhi and provide interchange connectivity with the Indian Railways’ main radial routes (eg. Delhi – Rohtak, Delhi – Ambala), the Dedicated Freight Corridor (DFC) at Pirthala (near Palwal), major logistic hubs and the 164 km Delhi – SNB – Alwar RRTS Line at Panchgaon.

For more updates, check out my Home Page!

– TMRG

Subscribe to Free Email Notifications

Enter your email address below and click on Sign Up!

written by

Global traveler who prefers mass rapid transit

10 Responses to "RITES-SMEC Wins Haryana Orbital Rail Corridor’s GC Contract"

  1. Rupraj Sengupta says:

    Lovely surprise wasn’t expecting anything like this the maddening traffic on the roads can be avoided!

    Reply
  2. Dd says:

    Deadline of construction of Mumbai ahemdabad her is 9 December 2024

    Reply
  3. deep shah says:

    any updates on Project Management Consultancy Services for Construction of Civil
    Works Packages for NHSRCL ?

    Reply
  4. Mohamed says:

    Haryana orbital corridor
    GC is a man months rate contract or % ??

    Reply
  5. Niraj Pandey says:

    When technical bid open of contractor?
    Orbital new project elevated or grounded ?

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Rupraj Sengupta Cancel reply

Your email address will not be published. Required fields are marked *