10 Bidders for Ahmedabad Metro Phase 2’s Package C3

10 firms / consortia have submitted bids to Gujarat Metro Rail Corporation (GMRC) for the construction of Ahmedabad Metro Phase 2 project’s 7.553 km Sector-1 – Mahatma Mandir section in Gandhinagar.

This is the 3rd and final section of this 28.254 km phase which will see Ahmedabad’s north-south Red Line getting extended by 22.838 km from Motera Stadium to Mahatma Mandir via 20 new stations with a 5.416 km spur from GNLU to GIFT City which includes 2 new stations.

GMRC invited tenders for its civil construction contract in February 2022 with a Rs. 610 crore estimate. Its completion period remains unknown to me but is likely to be 30 months looking at packages C1 and C2.

Bidders

  • Afcons Infrastructure
  • Dilip Buildcon Ltd. (DBL)
  • GR Infraprojects
  • JMC Projects
  • KEC – CVCC JV
  • Kalthia – Ashoka Buildcon Ltd JV
  • RVNL – DRA Infra JV
  • Ranjit Buildcon Ltd. (RBL)
  • URC Constructions (URCC)
  • YFC – MCL JV

IFB: GMRC/CONS/VDCT+STNS/PKG-C3/PH-2/2022

Package: C3

Brief Scope: Construction of 7.553 kms elevated viaduct and 7 nos. of stations (incl. E&M, Architectural Finishing, Roofing, Plumbing, Signage, etc.) from Sector-1 to Mahatma Mandir (ch. 31945.443m to 39498.302m, Package C3) in connection with Ahmedabad Metro Rail Project, Phase-2

This section will consist of 7 elevated stations at Sachivalaya, Akshardham, Juna Sachivalaya, Sector-16, Sector-24 and Mahatma Mandir.

Package C3: Sector-1 – Mahatma Mandir section with indicative location of stations – view Ahmedabad Metro Phase 2 route map & information

The bids have now been sent for technical bid evaluation which can take a couple months to complete. When that is done, the financial bids of the technically qualified bidders will be opened to reveal who’s the lowest bidder and most likely contractor.

This section’s design was prepared by SYSTRA MVA Consulting (India) as the DDC and its construction will be financed by Agence Française de Développement (AFD) which I expect will begin in Q4 2022.

The first 2 sections of Phase 2 are well under construction with both contractors commencing U-girder launching activity in Q4 2021:

PackageContractor
C1: Motera to GNLU (8.124 km) and GNLU to GIFT City (5.420 km) with 10 stationsAfcons Infrastructure
C2: GNLU to Gandhinagar Sector-1 (6.478 km) with 5 stationsRanjit Buildcon

A list of all Phase 2 packages (consultant, civil, system) and their contractors can be viewed here.

For more updates, check out the Ahmedabad section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

6 Responses to "10 Bidders for Ahmedabad Metro Phase 2’s Package C3"

  1. Pratik says:

    Which of these bidders have best track record ?

    Reply
    • TMRG says:

      Afcons followed by KEC are heavy-weights. Rest are light-weights with significant low to mid value contract experience.

      Reply
  2. piyush dalal says:

    when will be the possible month for the award of the contract

    Reply
  3. Metro rail girl says:

    DBL is L1 bidder

    Reply
  4. Ravi Rathod says:

    hello, sir, can you please updates about GDCLPSP and URC ahmedabad Depot estimate tender

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Ravi Rathod Cancel reply

Your email address will not be published. Required fields are marked *