Ranjit Buildcon Wins Surat Metro Line-1 Package CS4’s Work

Ranjit Buildcon Ltd. (RBL) on Saturday emerged as the lowest bidder to construct the 4.15 km Sarthana – North Ramp section of Surat Metro’s 22.77 km Line-1 connecting Sarthana – Dream City.

Package CS-4 is the 4th and final section of Surat’s 22.77 km Line-1 which will connect Sarthana – Dream City via 20 stations. It’ll comprise of 4 elevated stations at Sarthana, Nature Park, Varaccha Chopati Garden and Shri Swaminarayan Mandir Kalakunj in the north-east part of the city.

GMRC invited tenders for its construction in February with a Rs. 286 crore estimate and unknown deadline. Technical bids were opened in May to reveal 8 bidders.

Financial Bid Values

FirmBid (Rs. Crore)
Ranjit Buildcon Ltd. (RBL)384.47
Ashoka Buildcon388.34
DRA Infracon397.64
Kalthia Engineering & Construction404.81
Evrascon – Varindera Construction JV416.41
KEC International417.20
Rail Vikas Nigam Ltd (RVNL)412.47
MCL – YFC JV439.40

Tender Notification: GMRC/CONS/VDCT+STNS/PKG-CS4/PH-1/2022

Scope: Construction of 4.15 km (ch. -450 to ch. 3700) elevated viaduct dead end of Sarthana station to end of UG ramp including 4 stations (Excl. E&M, Architectural finishing and Roofing) for Surat Metro Rail Project Phase – 1, Corridor-1

Route of Surat Metro’s North Ramp – Sarthana section with the indicative location of stations enroute – view Surat Metro Phase 1 route map & information

RBL’s bid of Rs. 384.47 crore was significantly higher (34.43%) than GMRC’s estimate, so I see this heading to the negotiating table. If a significant price reduction is not made – typically by reduction in scope – then it’ll be retendered which will likely be the case.

With this development and Package CS6’s opening (where DBL is L1), financial bids for all civil packages of the main-line have now been opened. A list of all Surat Metro Phase 1 packages and their status/contractors can be viewed here.

For more updates, check out the Surat section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

6 Responses to "Ranjit Buildcon Wins Surat Metro Line-1 Package CS4’s Work"

  1. Sarvej says:

    When start work on rrts Delhi to panipat

    Reply
    • TMRG says:

      Depends on when the Delhi and Central govts approve its DPR. Unlike Delhi-Alwar RRTS, no detailed design work or geotechnical work has even started.

      So easily not before 2025.

      Reply
  2. Harvesp Variava says:

    What about chowk bazar ramp to kadar Shah ni nal station sector ????

    Reply
    • TMRG says:

      Comes under Package CS1 (awarded to Sadbhav Engineering – SP Singla Construction JV and subcontracted to Patel Infra)

      Reply
  3. Sandeep Bhatnagar says:

    Dear Sir,
    We are Gladier Business House Pvt Ltd, Jamshedpur, Jharkhand.
    We are having 14 persons all rounders workmen team in Surat, to work on VIADUCT pile, pile cap, pier, pier cap. If needed then please contact on whatsapp +91-9005061178.
    Regards

    Reply
  4. Denis Hingaladiya says:

    Are you looking for GPS Tracking and fuel monitoring system please contact us.

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Sandeep Bhatnagar Cancel reply

Your email address will not be published. Required fields are marked *