5 Bidders for Delhi-Meerut RRTS Line’s Package 7

Five construction firms / consortia have submitted bids to build the roughly 12 km elevated Package 7 of the 82.15 km Delhi – Meerut (RRTS) Line after officials from the National Capital Region Transport Corporation (NCRTC) opened e-tenders today evening to reveal its list of bidders.

NCRTC invited tenders for this package in April 2020 and expects the assigned contractor to complete work in 910 days (2.5 years) from when the contract is awarded. This section with 5 stations consists of 2 disjointed parts on either side of Meerut city and will be connected by the underground Package 8 for which bidding is underway.

  1. Northern end of Shatabdi Nagar to Brahampuri DN Ramp with 1 station at Brahmapuri (approx 2 kms)
  2. Begumpul UP Ramp to Modipuram with 4 stations at MES Colony, Daurli, Meerut North and Modipuram (approx 10 kms)

Bidders:

  • Afcons Infrastructure Ltd.
  • Dilip Buildcon – Sam India JV
  • Dineshchandra R. Agrawal Infracon Ltd.
  • Larsen & Toubro Ltd.
  • NCC Ltd.

The bids have now been sent for technical evaluation which can take a couple months to complete. When that is done, the financial bids of the technically qualified bidders will be opened to reveal who’s the lowest bidder and most likely contractor.

Tender No: Package 7 – DM/CN/COR-OF/108

Scope: Construction of elevated viaduct from end of Shatabdi Nagar Station to Brahmpuri DN ramp and from Begumpul UP Ramp to Modipuram end including Modipuram Depot entry Ramp and 5 elevated stations of Delhi – Ghaziabad – Meerut RRTS Corridor.

Package 7: Shatabdi Nagar – Brahmapuri DN Ramp and Begumpul Ramp – Modipuram sections – view Delhi – Meerut RRTS info & full map

4 out of 5 stations in this package – the ones at Brahmapuri, MES Colony, Daurli and Meerut North – will exclusively serve Meerut’s local metro system and serviced by ten 3-coach Bombardier trains.

With this development, here’s the current status of each package:

Package / SectionStatus
Package 1: Sahibabad Ramp – Ghaziabad Station (elevated, 2 stations)Under construction by KEC-CCECC JV
Package 2: Ghaziabad Station – Duhai EPE crossing (elevated, 2 stations)Under construction by APCO-CRFG JV
Package 3 Lot-1: Duhai (EPE) – Modi Nagar North (elevated, 2 stations)Under Construction by Larsen & Toubro
Package 3 Lot-2: Modi Nagar North – Shatabdi Nagar (elevated, 5 stations)Under Construction by Larsen & Toubro
Package 4: New Ashok Nagar Ramp – Anand Vihar – Sahibabad Ramp (underground, 1 station)STEC is Lowest bidder
Package 5A: Duhai Depot / WorkshopTechnical Bid Evaluation in Progress (6 Bids Received)
Package 6: Sarai Kale Khan – New Ashok Nagar (elevated, 2 stations)Technical Bid Evaluation in Progress (5 bids received)
Package 7: Shatabdi Nagar – Brahampuri – Brahampuri DN Ramp (elevated, 1 station) AND Begumpul UP Ramp – MES Colony – Daurli – Meerut North – Modipuram (elevated, 4 stations)Technical Bids Opened Today (this post)
Package 8: Brahampuri DN Ramp to Begumpul UP Ramp (underground, 3 stations)Bids Invited in February
Package 9A: Multistoried Staff Quarters & ConnectivityTechnical Bids Opened on July 9 (7 bidders)
Package X: Modipuram Depot / WorkshopBid Notice Pending

For more updates, check out the NCR RRTS section of The Metro Rail Guy!

– TMRG

written by

Global traveler who prefers mass rapid transit

One Response to "5 Bidders for Delhi-Meerut RRTS Line’s Package 7"

  1. Manas Rustogi says:

    LOA issued to L&T.

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *