Trials Begin Through Ahmedabad Metro’s Tunnels & Sabarmati Bridge

Gujarat Metro Rail Corporation (GMRC) on Friday launched train testing on a 10.2 km section between Apparel Park and Gujarat University stations on Ahmedabad Metro Phase 1’s 20.737 km east-west Blue Line.

With electrification work still ongoing, GMRC’s team operated a Zephir battery-operated railcar mover to pull one of its Hyundai Rotem trains through the line’s 6.83 km Shahpur – Kankaria East underground tunnels (built by L&T and Afcons Infra) and out of the West Ramp to the 298.20m Sabarmati River Bridge (built by TPL – CCECC).

Ahmedabad Metro’s underground section – view Phase 1 route map & information

GMRC’s primary goal was to check for Schedule of Dimensions (SOD) clearances and observe the train’s interaction with the civil structure to ensure there are no physical obstructions along the way.

Pulling out of the West Ramp – all photos via follower Anil Kumar Bishnoi

Operations on the Blue Line’s 6 km Vastral – Apparel Park section had started on March 6, 2019. This is the first time a train has traveled west of Apprarel Park, underneath the old city, over the Sabarmati and across to West Ahmedabad.

Along the way, the train passed through 8 stations at Kankaria East, Kalupur Railway Station, Gheekanta, Shahpur, Old High Court Interchange, Stadium, Commerce Six Roads and Gujarat University.

Video by a local YouTuber shot at Sabarmati Riverfront:

There’s immense pressure on GMRC to begin operations on the entire 39.26 km Phase 1 project by India’s 75th Independence Day, so we’ll likely see trains starting to run on the rest of the network in / around that time with station finishing works being conducted well into 2023.

For more updates, check out the Ahmedabad section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

15 Responses to "Trials Begin Through Ahmedabad Metro’s Tunnels & Sabarmati Bridge"

  1. Pankaj says:

    I think electrification work is pending inside tunnel and bridge, because as I see it is completed from old high court to Doordarshan

    Reply
  2. Neil says:

    Very excited to see in future

    Reply
  3. Clevin Gomes says:

    Is there a Crossover at Gujarat University? As I saw that Thaltej Metro Stn doesn’t have it so i wonder how trains will change tracks after passing Underground section

    Reply
  4. Aadit says:

    When will metro start till kalupur

    Reply
  5. Loga says:

    I have high hopes GMRC will operationalise the entire 39.26 km phase 1 by August 15,especially when most of of the construction work is completed.

    Reply
  6. Sathyanarayana says:

    We manufacturing all types of bridge bearing , expansion joint & sound barrier
    We are rdso and morth approved vendor,
    Spherical bearing , pot ptfe bearing , elastomeric bearing , rocker roller bearing , strip seal , modular seal , omega joint and etc

    [email protected]

    Reply
  7. Pratik Chaudhary says:

    Hi TMRG,

    Your map of Ahmedabad metro phase 1 has huge mistake.

    The position of Ghee Kanta metro station is very far away. And hence the path also becomes faulty.

    Please do update it.

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *