Mumbai Metro Line 3’s Station Finishing & Signage Work Underway
With tunneling works on 33.5 km Mumbai Metro Aqua Line (Line-3)’s Phase…
With tunneling works on 33.5 km Mumbai Metro Aqua Line (Line-3)’s Phase…
Afcons Infrastructure – SAM India JV today celebrated the first breakthrough…
India’s National High Speed Rail Corporation (NHSRCL) on Saturday announced…
The Commissioner of Metro Railway Safety (CMRS) from the Indian Railways’…
Madhya Pradesh Metro Rail Co Ltd (MPMRCL) on Tuesday started trial runs (train…
Afcons Infrastructure on Thursday started lowering and assembling their second…
Seven firms have submitted bids for the civil construction of a new terminal…
Per an industry source – 4 firms have submitted bids to supply and install…
Zetwerk on a subcontract from Larsen & Toubro – IHI Infrastructure Systems last week completed trial assembly on a 130 meter long open web girder…
Rahee Infratech was today declared as the lowest bidder to supply and install ballastless tracks on Mumbai Metro’s 11.38 km Line-9 which will…
Vishal Infrastructure Ltd. last month was awarded a Rs. 152.87 crore construction contract by Airports Authority of India (AAI) for Prayagraj Airport’s…
The Commissioner of Metro Railway Safety (CMRS) from the Indian Railways’ Southern Circle today completed inspection on Bangalore Metro Purple Line’s…
The first look of Bangalore Metro’s CRRC prototype train for the 19.143 km Yellow Line currently undergoing factory acceptance tests (FAT) in…
Larsen & Toubro (L&T) this weekend officially started preliminary construction activities to construct Kolkata Metro Line-3 (Purple Line)’s 5.05…