AECOM Wins Mumbai Metro Line-10 & Line-12’s GC Contract

AECOM India today won the General Consultant (GC) service contract for civil works of Mumbai Metro‘s upcoming 9.20 km Line-10 (Gaimukh – Shivaji Chowk in Mira Road) and 20.7 km Line-12 (Kalyan – Taloja).

AECOM’s selection among 5 bidders was made on the Quality cum Cost Basis System (QCBS) method in which the winner’s selection is made through a combination of points scored in technical and financial evaluation. In this, AECOM had recorded the highest technical score and also placed the lowest financial bid.

Mumbai Metropolitan Region Development Authority (MMRDA) had invited GC bids in July with a 48 month completion period. Technical bids were opened in October to reveal 5 bidders.

Total Scores:

FirmTotal Score
AECOM78.830
AYESA – KRNA JV73.692
SYSTRA71.433
SMEC70.793
DB Engineering – Louis Berger JV67.328

Tender No: MMRDA/Metro- PIU/0002141

Brief Scope: Appointment of General Consultant for Civil work of Metro Line 10 (Gaimukh To Shivaji Chowk (Mira Road) and Metro Line 12 (Kalyan to Taloja)

Indicative routes of Mumbai Metro’s Line-10 and Line-12 – view Mumbai Metro info & map

Mumbai Metro’s Line-10 will be built as a western extension of the 35.2 km Line-4/4A (Green Line) with 4 stations at Gaimukh Reti Bundar, Varsova Char Phata, Kashimira, Shivaji Chowk. The line will form an interchange with Line-9 (Red Line) at Pandurang Wadi, where possibly a fifth station could come up for providing easy transfers.

Line-12 will be built as a 20.75 km southern extension of the 24.95 km Line-5 (Orange Line) with 17 stations at Ganesh Nagar, Pisvali Gaon, Golavali, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilaje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Taloja. The line’s depot is planned at Pisarve.

The appointment of a dedicated General Consultant to assist MMRDA is expected to pave the way for both lines’ speedy implementation through assistance in design, supervision, safety, quality control and contract management. A more detailed scope can be viewed at the bottom of this post.

The foundation stone for both lines was unveiled by the Prime Minister in September 2019. With this development – civil tendering for Line-10’s construction can be expected to start in 2021 if the state government and MMRDA have the financial appetite. The development of Line-12 is possible independently without Line-5, which is facing major land acquisition hurdles in Kalyan, but ultimately its success and integration with the rest of the network is dependent on Line-5.

For more updates, check out the Mumbai section of The Metro Rail Guy!

– TMRG

written by

Global traveler who prefers mass rapid transit

21 Responses to "AECOM Wins Mumbai Metro Line-10 & Line-12’s GC Contract"

  1. Hari Sridhar Rao says:

    Congrats to AECOM team

    Reply
  2. Clevin Gomes says:

    I Hope that they will float a tenders for its construction?

    Reply
    • Bhavesh Agarwal says:

      Just trying to understand why tenders now that AFCON has won the contract? What else is remaining for the work to actually start?

      Reply
  3. Pranav says:

    Any updates on BEML rakes of mumbai metro 2 & 7 ….which supposed to be in mid of December

    Reply
  4. baskaran says:

    Aecom and Louis berger jv for line 10 and line 12

    Reply
  5. Hemendra Kumar says:

    Congratulations all sub contractors (Assistant safety Manager) Dogus Soma
    8928988319.

    Reply
  6. Sanjay sharma says:

    Congratulations to AECOM team.

    Reply
  7. Rajeev says:

    Hi Metro Guy, could you pls update about Metro Line 13 abd its proposed route

    Reply
  8. Prabhakar Satpude says:

    Congratulations to team Aecom, as I am working in Ahmedabad metro from RITES LTD JV with team Aecom and other ,will happy to join Aecom if I get opportunity
    Thanking You!

    Reply
  9. Madhav Amin says:

    Congratulations to AECOM

    Reply
  10. GURPREET SINGH says:

    Congratulations to AECOM 💐💐
    Are there any new vacancies for new projects?

    Reply
  11. Ujjal Bhattacharya says:

    Congratulation to AECOM team for achieving this challenging contract.

    Reply
  12. Atul Tiwari says:

    Congratulations to AECOM. You deserve it.

    Reply
  13. SHARAD BHAT says:

    To,
    The Manager,
    Planning Department,
    The Mumbai Metro Rail Corporation Limited,
    Bandra (East), Mumbai – 400 051.
    Sub. Request for Metro service for our area of Airoli, Rabale, Ghansoli, Mahape, MBP, Palava

    Dear Sir, as announced recently, there will be a Kalyan-Dombivali-Katai- Taloja *metro 12* service & a work for Wadala -Ghatkopar -Sonapur -Kasarwadavali *metro 4* service is going on. We request you to have a small patch connecting these two routes via Bhandup Sonapur -Nahur-Airoli, Rabale Ghansoli- Mahape MBP- Nalco circle – Shil, Palava, Katai.
    This small patch will help lot many people mainly residents & employees from this area to commute to Kalyan, Dombivali, Katai, Taloja, Wadala, Ghatkopar, Sonapur, Thane Kasarwadavali as well as via other metro lines from there end or in between to Colaba, CST, Wadala, Dadar, Bandra, Andheri, Airport, Dahisar, Mira Road, Bhayandar, Bhiwandi, Vasai Virar, Badalapur etc.
    Even this will help commuter from those other metros& can provide a last mile connectivity.
    In addition to residents from this area, there are large corporates and corporate parks like Reliance, Capgemini, Mind Space, MIDC, MBP, Palava etc.
    It will be a commercially viable and sure success and will definitely help to reduce traffic congestion on the road in a day’s to come, one of the reason being Reliance may shift their other operations too to their corporate park at Ghansoli.

    In MMR region, comparatively rest all areas are connected via 14 metro lines, but this patch is only missed out and remained aside.

    Request you to please go through the videos from below 3 links. Our request is for connecting metro 4 at Bhandup, Sonapur with Metro 12 at Katai, Nilaje via Airoli, Rabale, Ghansoli, Palava

    https://youtu.be/nf2coY0aSEg

    https://youtu.be/PCcMPtbx32Y

    https://youtu.be/8sK8RZ0FEY0v

    Sir, request you to please look into it and do the needful.

    Thanks and Regards,

    Reply
  14. Pravin Londhe says:

    Congratulations to AECOM

    Reply
  15. S I D D H E S H S I R S A T says:

    Any current update about LOA and all.

    Reply
  16. HARISH BHATT says:

    Hey TMRG – Any update you can share on Metro 13 – Its in DPR stage from 2018 onwards and 3 years passed by but no update on it from MMRDA

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Bhavesh Agarwal Cancel reply

Your email address will not be published. Required fields are marked *