Delhi Metro Rail Corporation (DMRC) has in the past fortnight invited tenders through two packages to augment, remodel and procure tracks at the Delhi Metro Pink Line’s Mukundpur Depot.

Besides augmenting capacity for the Pink Line, these works under the 65.1 km Phase 4 project are being undertaken to allow for the Magenta Line’s trains to be stabled and maintained at Mukundpur in the future.

Pink Line (Line-7) will see the following additional facilities created:

  • Inspection Bays: 3
  • Workshop Bays: 1
  • Stabling Lines: 12
  • Test Track: 1

Magenta Line (Line-8) will see the following new facilities created:

  • Inspection Bay: 2
  • Workshop Bays: 2
  • Stabling Lines: 13
  • Test Track: 1
  • Shunting Neck: 1
  • ETU: 1

Civil Work: DC-27

Brief Scope: Civil Works for Remodeling & Augmentation of Mukundpur Metro Depot cum Workshop including design, fabrication, supply & erection of pre-fabricated steel roof structures, roof portals, purlins, sheeting etc. and water supply, sanitary installation, drainage & site development works at Mukundpur Depot for Line 7 & Line 8 of Delhi MRTS Phase IV Project.

  • Estimate: Rs. 71.37 crore
  • Completion Period: 30 months
  • Bid Invited: March 26, 2021
  • Pre-Bid Meeting: 07.04.2021 at 1100 hrs
  • Bid Submission End Date: 04.05.2021 at 1500 hrs
  • Technical Bid Opening Date: 05.05.2021 at 1500 hrs
Representational only: Pink Line’s Hyundai Rotems lined up at Mukundpur Depot in 2017
Grainy track-work design from DMRC’s tender docs – view large (lines in red are net new additions)

Track Work: DT-12

Brief Scope: Supply, Installation, Testing & Commissioning of Ballasted/Ballastless Track in Mukundpur Depot for augmentation of additional maintenance facilities in Standard Gauge Corridor of Delhi MRTS Project of Phase-IV

  • Estimate: Rs. 9.63 crore
  • Completion Period: 24 months
  • Bid Invited: April 5, 2021
  • Pre-Bid Meeting: 13.04.2021 at 1100 hrs
  • Bid Submission End Date: 28.04.2021 at 0900 hrs
  • Technical Bid Opening Date: 04.05.2021 at 1600 hrs

Back in March, DMRC had invited bids for augmenting the depot’s 25 kV overhead equipment (OHE) and 33 kV auxiliary power supply through Package DE-14.

Besides this depot, the Violet Line’s Sarita Vihar and Ajronda depots are also being augmented and remodeled in Phase 4 to accomodate for Silver Line’s trains at Sarita Vihar.

Outside of Delhi, Bangalore Metro Purple Line’s Baiyappanahalli Depot is in line to get remodeled for handling Phase 2A/2B Blue Line’s rolling stock. A tender notice for that is still pending and I hear it’ll be valued at roughly Rs. 104 crore. Per Naveen Menezes’ report at Bangalore Mirror, that depot will become a multi-level facility.

For more updates, check out my Home Page!

– TMRG

written by

Global traveler who prefers mass rapid transit

2 Responses to "Bids Invited for Delhi Metro Mukundpur Depot’s Remodel & Tracks"

  1. Prateek says:

    What is full form of ETU?

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *