SYSTRA – DB Wins Mumbai Metro Line 10 & 12’s General Consultancy
SYSTRA MVA Consulting – DB Engineering & Consulting JV on Monday emerged as the preferred bidder for the General Consultant (GC) contract of Mumbai Metro‘s 9.20 km Line-10 (Gaimukh – Shivaji Chowk) and 20.7 km Line-12 (Kalyan – Taloja).
The appointment of a dedicated General Consultant to assist Mumbai Metropolitan Region Development Authority (MMRDA) is expected to pave the way for both lines’ speedy implementation through assistance in design, supervision, safety, quality control and contract management.
MMRDA had originally invited GC bids in July 2020 from global engineering and consultancy firms for just civil work. AECOM had emerged as the preferred bidder in December 2020, but a contract wasn’t awarded.
Tenders were re-invited tenders in February 2022 with a scope that now includes both civil and system integration work. SYSTRA – DB JV on Monday was declared as the preferred bidder through the Quality and Cost-Based Selection (QCBS) method after adding technical & financial scores.
Bid Values & Total Scores
Bidder | Bid (Rs. Crore) | Total Score |
SYSTRA – DB | 265.10 | 91.06 |
AECOM – HILL | 340.60 | 90.74 |
AYESA – KNR | 254.92 | 89.39 |
Tender No: MMRDA/Metro- PIU/0002141
Brief Scope: GC-07A Appointment of General Consultant for Civil and System works of Mumbai Metro Line 10 (Gaimukh – Shivaji Chowk (Mira Road) and Mumbai Metro Line 12 (Kalyan- Taloja) of Mumbai Metro Rail Project of MMRDA, Mumbai.
If awarded to SYSTRA – DB JV, they’ll be required by MMRDA to stay on board for 54 months – the expected duration of the project.
Mumbai Metro’s Line-10 will be built as a western extension of the 35.2 km Line-4/4A (Green Line) with 4 stations at Gaimukh Reti Bundar, Varsova Char Phata, Kashimira, Shivaji Chowk.
Line-12 will be built as a 20.75 km southern extension of the 24.95 km Line-5 (Orange Line) with 17 stations at Ganesh Nagar, Pisvali Gaon, Golavali, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilaje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Taloja. The line’s depot is planned at Pisarve.
At this point of time, I don’t see the tendering process starting for either line’s civil construction before mid-2023.
For more updates, check out the Mumbai section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.
– TMRG
How a fresher passout Civil Engineer can get a job of Graduate Training in Mumbai metro????