Kanpur Metro: Ceigall Begins Casting U-Girders for Package KNPCC-12
Ceigall India and its subcontractor Dixcon Infra this Thursday began casting 28 meter long U-girders for Package KNPCC-12 of Kanpur Metro’s 8.38 km Line-2 which will connect Agriculture University and Barra-8.
Ceigall’s casting yard at Naubasta’s Hanspuram neighborhood (view on Google Maps) consists of 4 U-girder casting beds from where I estimate approximately 320 U-girders weighing 170MT will be cast to build the viaduct of Kanpur Metro Phase 1 project‘s 4.3 km Package KNPCC-12.
Uttar Pradesh Metro Rail Corporation (UPMRC) had awarded Ceigall with KNPCC-12’s Rs. 427.11 crore construction contract in March 2024 with a 30 month deadline.
Package KNPCC-12 consists of 2 disjointed elevated sections on either side of underground Package KNPCC-11 (Agriculture Depot – Double Pullia Ramp) which was awarded for construction to KPIL – Gulermak JV in December 2023.
At 3.745 km, the southern section of KNPCC-12’s viaduct will connect Double Pullia Ramp and Barra-8 with 4 elevated stations at Vijay Nagar Chauraha, Shastri Chowk, Barra-7 Station and Barra-8. On the northern-end of the line, past Rawatpur Interchange Station, a small 557.8m viaduct will be built with 1 elevated station at Agriculture University next to Line-2’s Agriculture University Depot.
Ceigall had started casting pier caps for the line’s viaduct in June and will soon start casting double-T girders and I-girders at their yard which appears to me was earlier used for constructing Line-1’s Package KNPCC-07 (Transport Nagar Ramp – Naubasta Station).
KPIL (earlier JMC Projects) in May had completed casting all 348 U-girders, Double T-girders and I-girders for Package KNPCC-07, so from a cost and effort perspective it makes perfect sense to me to utilize an existing yard than to set up a new one.
Kanpur’s Line-2 is moving along nicely with lots of behind-the-scenes developments. Ceigall last week began piling work for the line’s viaduct and then a week prior to that Herrenknecht completed factory acceptance tests (FAT) on KPIL – Gulermak JV’s first tunnel boring machine (S-1408A) for 4.08 km underground Package KNPCC-11 (Agriculture Depot – Double Pullia Ramp).
For more updates, check out the Kanpur section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.
– TMRG
Leave a Reply
Want to join the discussion?Feel free to contribute!