5 Bidders for Bhopal & Indore Metros’ Design Verification Engineer Work
Five firms in October submitted bids for the Design Verification Engineer (DVE)…
Five firms in October submitted bids for the Design Verification Engineer (DVE)…
December 13: 2023: DMRC has awarded YFC Projects’ with a Rs. 25,22,94,789.51…
Afcons Infrastructure has started piling work to build Shaft-2 at Mumbai’s…
Uttar Pradesh Metro Rail Corporation (UPMRC) on Monday invited bids for the…
Hindustan Construction Company – KEC International JV (HCC – KEC JV) in…
Besides Agra Metro’s Package AGCC-05, Uttar Pradesh Metro Rail Corporation…
Uttar Pradesh Metro Rail Corporation (UPMRC) on Monday invited tenders for the…
November 20, 2023 Update: DMRC has awarded Ayesa India with a Rs. 3,19,97,000…
December 15, 2023 Update: Balaji Railroad Systems – Habog Consultants JV has been awarded a Rs. 24,95,000.00 contract by Chennai Metro Rail Ltd….
Larsen & Toubro today celebrated the first ever tunnel breakthrough for Delhi Metro’s 23.622 km Silver Line (Line-10) which will connect…
Nyati Engineers and Consultants Pvt. Ltd. (NECPL) in mid-October was declared as the lowest bidder for the civil construction work of a new terminal building…
PADECO – Mott MacDonald – Hill International – BARSYL consortium has been finalized to provide consultancy services for the 65.1 km Delhi…
Five firms have submitted bids to provide architectural and engineering consultancy services for Phase 2 of Ayodhya Airport’s construction in Faizabad,…
Larsen & Toubro last night completed lowering tunnel boring machine (TBM) DZ1125 at Chhatarpur Mandir Station of Delhi Metro’s 23.622 km Silver…