Pune Metro Phase 1 Extension – Information & Update
Menu: News & Construction Updates | Overview | Phase 1 Info | Line-3 Info | Phase 1 Extn Info | Phase 2 Info
Pune Metro Phase 1 Extension (Phase 1A) project in Pune, Maharashtra involves the extension of Pune Metro’s 16.589 km Purple Line and 14.655 km Aqua Line, built in Phase 1, to Nigdi (Bhakti Shakti), Katraj, Chandni Chowk and Wagholi.
Pune Metro Phase 1A Detailed Project Report (DPR) was prepared by SYSTRA MVA Consulting and has been published online over here by Maharashtra Metro Rail Corporation (MahaMetro).
The project’s 4.519 km northern extension from PCMC to Bhakti Shakti with 4 elevated stations was approved was approved by the Central Government’s Cabinet in October 2023 with an estimated cost of Rs. 910.18 crore.
Its 5.46 km underground southern extension from Swargate to Katraj with 3 underground stations was approved by the Central Government’s cabinet in August 2024 with an estimated total cost of Rs. 2954.53 crore.
Maharashtra’s state government in March 2024 approved the Aqua Line’s 1.12 km western extension (Line-2A) between Vanaz – Chandni Chowk and 11.63 km eastern extension (Line-2B) between Ramwadi – Wagholi. These lines are currently awaiting the Central Government’s approval.
Construction on Pune Metro’s Phase 1 Extension started in mid-2024. I expect Phase 1 Extension to be completed and opened no sooner than 2029.
Phase 1 Extension Routes
Purple Line: Pimpri Chinchwad Municipal Corporation (PCMC) – Bhakti Shakti
- Length: 4.519 km
- Type: Elevated
- Number of Stations: 4
- Station Names: Chinchwad, Akurdi, Nigdi and Bhakti Shakti
Purple Line: Swargate – Katraj
- Length: 5.464 km
- Type: Underground
- Number of Stations: 3
- Station Names: Market Yard (Gultekdi), Saibaba Nagar and Katraj
Aqua Line: Vanaz – Chandni Chowk
- Length: 1.12 km
- Type: Elevated
- Number of Stations: 2
- Station Names: Kothrud Bus Depot & Chandni Chowk
Aqua Line: Ramwadi – Wagholi
- Length: 11.63 km
- Type: Elevated
- Number of Stations: 11
- Station Names: Viman Nagar, Somnath Nagar, Kharadi Bypass, Tulaja Bhavani, Ubale Nagar, Upper Kharadi Raod, Wagheswar Temple, Wagholi, Siddharth Nagar, Bakori Phata and Vitthalwadi
Route Map
An official PDF route map for Pune Metro Phase 1 Extension will be added here when available.
The embedded map below shows the location of all stations for Phase 1 (exact), Line-3 (indicative) and Phase 1A (indicative), and can be zoomed into!
Tenders & Contracts
Contract | Contractor / Status |
P2-Consul-1: Engagement of General Consultant for Phase 1 Extension and Phase 2 | Bidding Underway |
P1A-Consul-1: Preparation of Environmental Impact Assessment (EIA) and Environmental Mitigation Plan (EMP) | MITCON Consultancy and Engineering Service Ltd. |
P1Misc-34: Geotechnical investigation of Swargate – Katraj underground section of NS Corridor | Myrtle Project and Consultancy Pvt. Ltd. |
DDC-01: Detailed Design Consultant for 3 elevated stations at Chinchwad, Akurdi and Nigdi, excluding viaduct within station portions | LKT Engineering |
DDC-02R: Detailed Design Consultant for architectural and E&M Services and proof checking of Swargate to Katraj Corridor | PINI India Pvt. Ltd. (PIPL) |
DDC-03: Detailed Design Consultant for 2 elevated stations of Line 2A (Vanaz to Chandni Chowk) and for 11 elevated stations of Line 2B (Ramwadi to Wagholi) | STUP – RITES JV |
P1A-PC-01: Proof Checking Consultant for Detailed Structural Design of Viaduct of PCMC to Nigdi Corridor | Structcon Designs Pvt. Ltd. |
P1A-C-01: Construction of elevated viaduct of length 4.519 Kms from CH: (-)1079.899m to CH: (-)5599.298m between PCMC and Nigdi (Bhakti Shakti) | Rail Vikas Nigam Ltd. (RVNL) |
P1A-C-02: Construction of four (04) nos Elevated Metro Stations viz. Chinchwad, Akurdi, Nigdi and Bhakti Shakti excluding viaduct, pier arms, girder erection, deck slab at concourse and platform level and E and M works | Bidding Underway |
P1A-UGC: Design and Construction of Underground Stations at Market Yard, Padmavati, Katraj and Associated Tunnels at North South Corridor | Bidding Underway |
Click on ‘News & Construction Updates’ below for project news, progress and updates.
Menu: News & Construction Updates | Overview | Phase 1 Info | Line-3 Info | Phase 1 Extn Info | Phase 2 Info
Page last updated: October 17, 2024. Have a question or spot an error? Let me know here.