Mumbai Metro – Information, Map & Updates

Menu: Construction Updates | Overview

Introduction

The Mumbai Metro system is an urban Mass Rapid Transit System (MRTS) serving Maharashtra’s capital. Its development has been entrusted to the Mumbai Metropolitan Region Development Authority (MMRDA), who in 2004 came out with a 146.5 km master plan with multiple lines. Due to various issues which range from policy paralysis to environmental issues, the MMRDA has so far only been able to implement 1 metro line to connect Versova in the western suburbs with Ghatkopar in the eastern suburbs. In 2015, a new 118 km master plan was approved and the new government has provided much needed impetus for the development of 2 lines (Dahisar E – Andheri E & Dahisar – D.N. Nagar) in addition to the upcoming Colaba-SEEPZ line.

Key Figures

Operational: 11.4 km | Under Construction: 68.2 km | Approved: 55.82 km | Proposed: 38.5 km

Note: The MMRDA has not fixed line colors yet.

Operational
Line-1: Versova – Andheri – Ghatkopar – 11.4 km
Executed & operated by a JV of Reliance Infra (69%), MMRDA (26%) & Veolia Transport (5%)
Stations: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway (WEH), Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar

Under Construction
• Line-2A: Dahisar (E) – D.N. Nagar – 18.6 km
This line is part of the larger 40 km line between Dahisar & Mankhurd
Line 2B will link DN Nagar with Mankhurd (23.5 km)

Line 3: Colaba – BKC – SEEPZ –  33.5 km
To be executed & operated by Mumbai Metro Rail Corporation Ltd – GOI (50%) & GoMH (50%)

Line-7: Dahisar (E) – Andheri (E) – 16.5 km
In the future, this line is expected to be extended to the CSI Airport and onward to Bandra (E)
To be executed by the Mumbai Metropolitan Region Development Authority

Approved

• Line-2B: D.N. Nagar – Mankhurd – 23.5 km
This line is part of the larger 40 km line between Dahisar & Mankhurd

Line-4: Wadala – Ghatkopar – Thane – Kasarvadavali – 32.32 km
To be executed by the Mumbai Metropolitan Region Development Authority
In the future, this line is expected to be extended to CST & possibly onward to Apollo Bunder in South Mumbai.

Proposed
Line-5: Thane – Bhiwandi – Kalyan – 24 km

Line-6: Lokhandwala – Jogeshwari – Kanjurmarg – 14.5 km
To be executed by the Mumbai Metro Rail Corporation Ltd

Operational Network

The embedded maps below can be zoomed into!

Future Network:

History – Key Dates

Phase 1
08 June 2014: Versova – Andheri – Ghatkopar – 11.4 km

…..more to be added in 2020! Click on ‘Construction Updates’ below to view updates.