The Mumbai Metro system is an urban Mass Rapid Transit System (MRTS) serving Maharashtra’s capital. Its development has been entrusted to the Mumbai Metropolitan Region Development Authority (MMRDA), who in 2004 came out with a 146.5 km master plan with multiple lines. Due to various issues which range from policy paralysis to environmental issues, the MMRDA has so far only been able to implement 1 metro line to connect Versova in the western suburbs with Ghatkopar in the eastern suburbs. In 2015, a new 118 km master plan was approved and the new government has provided much needed impetus for the development of 2 lines (Dahisar E – Andheri E & Dahisar – D.N. Nagar) in addition to the upcoming Colaba-SEEPZ line.

Key Figures

Operational: 11.4 km | Under Construction: 68.2 km | Approved: 93.79 km 

Note: The MMRDA has not fixed line colors yet.

Operational Lines
Line-1: Versova – Andheri – Ghatkopar – 11.4 km
Executed & operated by a JV of Reliance Infra (69%), MMRDA (26%) & Veolia Transport (5%)
Stations: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway (WEH), Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar

Under Construction Lines
• Line-2A: Dahisar (E) – D.N. Nagar – 18.6 km
This line is being executed by the Delhi Metro Rail Corporation (DMRC) on behalf of the Mumbai Metropolitan Region Development Authority (MMRDA) and is a part of the larger 41.2 km line between Dahisar East – Bandra – Mandale

Line 3: Colaba – BKC – SEEPZ –  33.5 km
This line is being executed by Mumbai Metro Rail Corporation Ltd – GOI (50%) & GoMH (50%)

Line-7: Dahisar (E) – Andheri (E) – 16.5 km
This line is owned by the Mumbai Metropolitan Region Development Authority (MMRDA) and the Delhi Metro Rail Corporation (DMRC) is its interim-consultant. In the future, this line will be extended to Mira-Bhayander in the north (Line-9) and to CSI Airport’s Terminal-1 & further to Bandra (E) in the south (Line-10)

Approved Lines (Bidding to assign civil construction contractors is underway)
• Line-2B: D.N. Nagar – Mankhurd – 23.5 km
This line is part of the larger 41.2 km line between Dahisar East – Bandra – Mandale

Line-4: Bhakti Park (Wadala) – Ghatkopar – Thane – Kasarvadavali – 32.32 km
To be executed by the Mumbai Metropolitan Region Development Authority
In the future, this line is expected to be extended to the GPO (CST) & possibly onward to Apollo Bunder in South Mumbai as part of Line-8

Line-5: Thane – Bhiwandi – Kalyan – 23.50 km

Line-6: Lokhandwala – Jogeshwari – Kanjurmarg – 14.47 km
To be executed by the Delhi Metro Rail Corporation

Proposed Lines (Not shown in any map below)

Line-11: Kalyan – Dombivli – Taloja
Delhi Metro Rail Corporation is conducting a feasibility study right now

Line-XX: Chhatrapati Shivaji International Airport (CSIA) – Navi Mumbai International Airport (NMIA)
Delhi Metro Rail Corporation is preparing a detailed project report (DPR) right now

Monorail Project (Displayed in Black in the maps below)
• Line-1: Chembur – Wadala Depot – 8.9 km – Operational
• Line-1: Wadala Depot – Jacob Circle – 10.64 – Under Construction

The embedded maps below show the exact location of all stations and can be zoomed into!

Operational Lines

Key: Metro Line-1 (Yellow) and Monorail Line-1 (Black)

Operational & Under Construction Lines

Note – Monorail’s Line-1 is shown in Black

Future Network Map (2025)

Note – Monorail’s Line-1 is shown in Black

History – Key Dates

08 June 2014: Versova – Andheri – Ghatkopar (Line-1) – 11.4 km

…..more to be added in 2020! Click on ‘Construction Updates’ below to view updates.