8 Bidders for Delhi Metro Magenta Line UG’s E&M Work

Eight firms have submitted tenders (bids) for electrical & mechanical systems of the 38.235 km Magenta Line’s new 2.03 km underground extension, after the Delhi Metro Rail Corporation (DMRC) opened tenders today for Package DE-03.

This new 2.03 km underground extension (DC-06) is under construction by HCC-VCCL JV between Vikaspuri Park Shaft – Krishna Park Extension Station – Vikaspuri Ramp. Tunneling work started on January 21, 2021.

DMRC invited bids for this E&M package and another dealing with OHE electrification works (DE-05) in December 2020. Both are among 44 packages of the 65.1 km Delhi Metro Phase 4 project that will be specifically funded by Japan International Cooperation Agency (JICA).

DMRC’s estimate is Rs. 57.96 crore and they expect the assigned contractor to finish all works within 36 months.

Bidders:

  • Blue Star Ltd.
  • EFKON India Pvt. Ltd.
  • ETA Engineering Pvt. Ltd.
  • Jakson Ltd.
  • Set Ritco JV Pvt. Ltd.
  • Sterling and Wilson Pvt. Ltd.
  • Sudhir Power Projects Ltd.
  • Tuaman Engineering Ltd.

Brief Scope: Design verification, Detail engineering, Manufacture, Supply, Installation, Testing & Commissioning of Electrical and Mechanical system including Fire, Hydraulic and DG set, Environment control system, Tunnel ventilation system and Building Management System for Krishna Park Ext Underground station of line-8 extension corridor of Phase-IV of Delhi MRTS

Magenta Line’s Vikaspuri Park Shaft – Vikaspuri Ramp underground section – view Phase 4 info & map

The bids have now been sent for technical evaluation which can take a couple months to complete. When that is done, the financial bids of the technically qualified bidders will be opened to reveal who’s the lowest bidder and most likely contractor for this E&M package.

Here’s a table with the status of all 11 Phase 4 E&M packages:

Package & ScopeContractor / Status
DE-01: E&M for Line-7 Extn, Line 8 Extn and Mukundpur Depot AugmentationSudhir Power Projects Ltd.
DE-02: 25 KV FOCS and SCADA system at augmented Sarita Vihar Depot & Ajronda DepotSalasar Techno Engineering Pvt. Ltd.
DE-03: E&M, TVS, BMS at Krishna Park Extn Station of Magenta Line8 Bids Received (this post)
DE-04: RSS for Phase 4’s 3 linesTender Notice Pending
DE-05: 25 KV AC OHE & SCADA at Krishna Park Exn Station of Magenta LineBidding Underway (Technical Bids to be opened Feb 16)
DE-06: UnknownN/A
DE-07: Escalators on LeaseBidding Underway (Technical Bids to be opened March 4)
DE-08: Underground Corridors’ TractionTender Notice Pending
DE-09: E&M, ECS/TVS & DG Sets of Underground Stations on Silver LineTender Notice Pending
DE-10: E&M, ECS/TVS & DG Sets of Underground Stations on Silver LineTender Notice Pending
DE-11: E&M, ECS/TVS & DG Sets of Underground Stations on Silver LineTender Notice Pending

For more updates, check out my Home Page!

– TMRG

Subscribe to Free Email Notifications

Enter your email address below and click on Sign Up!

written by

Global traveler who prefers mass rapid transit

6 Responses to "8 Bidders for Delhi Metro Magenta Line UG’s E&M Work"

  1. Himanshu Doria says:

    Hey TMRG, DDA in its budget have allocated 1000 cr for Rithala-Bawana-Narela metro corridor. Do you think DMRC can now fast track the progress of metrolite corridor of this route ?

    Reply
  2. Kushal says:

    Good luck to team S&W 👍

    Reply
  3. U says:

    TMRG
    A few days ago I had told you that Kolkata Metro Line 4(New Barrackpur-Barasat) stretch will be underground
    I got a report in English also,I thought you don’t know Bengali so it will be useless for you.
    Here’s a link Telegraph
    https://www.telegraphindia.com/west-bengal/prime-minister-nod-for-underground-metro-averts-eviction/cid/1805748

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Kushal Cancel reply

Your email address will not be published. Required fields are marked *