Mumbai Metro Line 9 to be Extended to Dongri with 2 New Stations

Besides Mumbai Metro Line-2B’s extension to Cheeta Camp, the Mumbai Metropolitan…

Read more

Afcons’ Delhi Metro Silver Line TBM S1264B Passes Factory Tests

Afcons Infrastructure with assistance from Herrenknecht last week completed…

Read more

Ahmedabad Metro Phase 2 C2’s Final U-Girder Launched by RBL

Ranjit Buildcon Ltd. (RBL) on Friday celebrated the launch of their final of…

Read more

Mumbai Metro Line 3’s Station Finishing & Signage Work Underway

With tunneling works on 33.5 km Mumbai Metro Aqua Line (Line-3)’s Phase…

Read more

Agra Metro’s TBM Shivaji Records 1st Breakthrough at Taj Mahal Ramp

Afcons Infrastructure – SAM India JV today celebrated the first breakthrough…

Read more

L&T Opens Mumbai – Ahmedabad Bullet Train’s Track Slab Facility

India’s National High Speed Rail Corporation (NHSRCL) on Saturday announced…

Read more

CMRS Inspects Bangalore Metro’s Challaghatta – Kengeri Section

The Commissioner of Metro Railway Safety (CMRS) from the Indian Railways’…

Read more

Bhopal Metro’s Trial Runs Begin on Orange Line

Madhya Pradesh Metro Rail Co Ltd (MPMRCL) on Tuesday started trial runs (train…

Read more

Kanpur Metro’s 4th TBM S639B Lowered at Kanpur Central by Afcons

Afcons Infrastructure on Thursday started lowering and assembling their second tunnel boring machine (TBM), S-639B, at Kanpur Central Station for constructing…

Read more

7 Bidders for Udaipur Airport’s New Terminal Contract

Seven firms have submitted bids for the civil construction of a new terminal building at Maharana Pratap Airport (UDR) in Udaipur, Rajasthan after Airports…

Read more

Mumbai Metro Line 6: 4 Bidders for Track Work Contract MT-09R

Per an industry source – 4 firms have submitted bids to supply and install balastless tracks on Mumbai Metro’s 15.18 km Line-6 (Pink Line)…

Read more

Mumbai – Ahmedabad Bullet Train’s Longest Girder Assembled

Zetwerk on a subcontract from Larsen & Toubro – IHI Infrastructure Systems last week completed trial assembly on a 130 meter long open web girder…

Read more

Mumbai Metro Line 9: Rahee Wins Track Work Contract CA-167

Rahee Infratech was today declared as the lowest bidder to supply and install ballastless tracks on Mumbai Metro’s 11.38 km Line-9 which will…

Read more

Prayagraj Airport New Terminal’s Contract Awarded to Vishal Infra

Vishal Infrastructure Ltd. last month was awarded a Rs. 152.87 crore construction contract by Airports Authority of India (AAI) for Prayagraj Airport’s…

Read more