TBM S-704 Makes Final Breakthrough for Chennai Metro’s PH1 Project
December 11, 2017 was a historic day for Chennai! 🙂 On that day, TBM S704…
December 11, 2017 was a historic day for Chennai! 🙂 On that day, TBM S704…
Back on December 8, tunnel boring machine (TBM) S-639 operated by Afcons Infrastructure…
Parts of TBM S-710, a Ø6.63m Herrenknecht tunnel boring machine arrived in…
Engineers and workers from the CEC-ITD Cem-TPL JV on this Sunday commissioned…
Following a small puja, engineers and workers from the Hindustan Construction…
On this past Sunday afternoon, tunnel boring machine (TBM) S640 operated by…
On this past Friday, tunnel boring machine (TBM) S52 “Gomti” operated…
Here’s a picture-post on ITD-ITD Cem JV’s two Herrenknecht tunnel…
So before TBM T-61 made a touch down in Mumbai on Sunday evening, the city’s…
Parts of TBM T-61, a Ø6.68m dual-mode tunnel boring machine, made a touch-down…