T58 – 2nd TBM for Mumbai Metro Line-3 Arrives at Mumbai Port
Parts of TBM T58, a Ø6.68m dual-mode tunnel boring machine, made a touch-down…
Parts of TBM T58, a Ø6.68m dual-mode tunnel boring machine, made a touch-down…
Update: The inspection has been pushed to September 25-26. The final round…
A consortium of India’s Hindustan Construction Company and UAE’s…
During the launch event for the 508 km Mumbai and Ahmedabad high-speed rail…
This news marks an excellent time for me to start tracking the 508 km Mumbai…
A consortium of LKT Engineering Consultants Ltd. and Architect Hafeez Contractor has…
Four coaches belonging to the 7th new Alstom Metropolis train-set for Lucknow…
The Bangalore Metro Rail Corporation Ltd (BMRCL) yesterday revealed an updated…
During the recent inspection of Nagpur Metro Line-1’s Khapri Depot by an official from the Research Design and Standard Organization (RDSO), Nagpur…
The Mumbai Metropolitan Region Development Authority (MMRDA) has invited bids from infrastructure firms for the construction of the 41.2 km Line-2’s (Dahisar…
Workers from NCC Ltd. have started launching precast segments to construct the 6-lane vehicle level of a 3.41 km double-decker structure on Wardha Road…
After starting work to cast guide walls in July, workers from Afcons Infrastructure have now moved on to the next step of building a diaphragm wall (D-wall)…
Chennai Metro Rail Ltd. has invited bids from infrastructure firms for the construction of its second depot at Wimco Nagar to support operations and maintenance…
Engineers from the Delhi Metro Rail Corporation (DMRC) and Alstom have completed testing the signalling and telecommunication system on a 5 km extension…