31.254 km Pune Metro Phase 1 project’s Detailed Project Report (DPR) with 2 metro lines and 29 stations was prepared & submitted by the Delhi Metro Rail Corporation in July 2009, revised in January 2013, August 2014, and finally once again in November 2015 to reflect current prices.
Although the State Government approved the project in 2012, it had run into red tape, politics and opposition from local NGOs & activists over its mostly elevated nature. The project received a final approval from the Union Government’s Cabinet on December 7, 2016.
In January 2017, Nagpur Metro Rail Corporation Ltd. (NMRCL) was renamed to Maharashtra Metro Rail Corporation Ltd. (Maha-Metro) to execute Pune Metro’s Phase 1 project.
Construction work on Pune Metro Phase 1’s 9.25 km first section (PCMC – Range Hills) started in August 2017 by NCC Ltd. Commercial operations on the first 2 sections of Phase 1 were inaugurated by Prime Minister Narendra Modi on March 6, 2022. The final section (District Court – Swargate) was inaugurated on September 29 2024.
System Specifications
- Top Speed: 80 kmph
- Average Speed: 34 kmph
- Track Gauge: Standard Gauge – 1435 mm
- Electrification: 25 kV, 50 Hz AC OHE
- Signalling: Communications-based Train Control (CBTC)
Key Figures
Operational: 31.25 km | Under Construction: 0 km
- Estimated Daily Ridership: 6 lakh in 2027
- Rolling Stock: 104 coaches (26 train-sets x 4) to be supplied by Titagarh Wagons
Pune Metro Phase 1 Lines (Operational)
Line-1 (Purple Line): Pimpri Chinchwad Municipal Corporation (PCMC) – Swargate
- Length: 16.589 km
- Type: Elevated & Underground
- Elevated: PCMC – Range Hills Ramp: 11.570 km, 9 stations
- Underground: Range Hills Ramp – Swargate: 5.019 km, 6 stations
- Depot: Range Hills (13.27 hectares)
- Number of Stations: 14
- Station Names: PCMC, Tukaram Nagar, Bhosari, Kasarwadi, Fugewadi, Dapodi, Bopodi, Khadki, Range Hill, Shivaji Nagar, Civil Court, Budhwar Peth, Mandai, Swargate
- Status: Entire line became operational on September 29, 2024 after a 3 stage opening.
Line-2 (Aqua Line): Vanaz – Ramwadi
- Length: 14.665 km
- Type: Elevated
- Depot: Kothrud (12 hectares)
- Number of Stations: 16
- Station Names: Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan Gymkhana, Sambhaji Park, PMC, Civil Court, Mangalwar Peth, Pune Railway Station, Ruby Clinic, Bund Garden, Yerawada, Kalyani Nagar, Ramwadi
- Status: Entire line became operational on March 6 2024 after a 3 stage opening
Pune Metro Phase 1 Route Map
The embedded map below shows the location of all stations for Phase 1 (exact) and Line-3 (tentative), and can be zoomed into!
An official PDF route map of Pune Metro will be added here when available.
Phase 1 Project Overview Video
Pune Metro Phase 1 Status
The entire Pune Metro Phase 1 is expected to be completed and opened in March 2024, much later than its December 2021 deadline.
Pune Metro Fares (Ticket Prices)
Pune Metro Tenders
Latest Pune Metro (Maha-Metro) tender notices can be viewed on Maha-Metro’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.
Pune Metro Phase 1’s Contractors
Contract | Contractor |
General Consultant (GC) | SYSTRA-AECOM-EGIS-RITES JV |
Environmental Impact Assessment (EIA) and Environmental Mitigation Plan (EMP) | RITES |
Social Impact Assessment (SIA) Study and Social Management Implementation plan, rehabilitation & resettlement (RR policy) plan | M/s Centre for Market Research & Social Development Pvt. Ltd. and M/s Manavadhikar Samajik Manch |
Detailed Design Consultant for 9 elevated stations between PCMC – Range Hills for Line-1 | AYESA Ingenieria y Arquitectura, S.A.U (Ayesa) |
Detailed Design Consultant for 12 elevated stations between Vanaz – Ramwadi for Line-2 | LKT Engineering Consultants Ltd. & Architect Hafeez Contractor |
Reach 1: PCMC – Range Hills (10.795 km viaduct’s construction for Purple Line) | NCC Ltd. |
Reach 2: Vanaz – Civil Court (7.150 km viaduct’s construction for Aqua Line) | NCC Ltd. |
Reach 1: PCMC – Range Hills (9 elevated stations’ construction on Purple Line) | HCC – Al Fara’a JV |
Reach 2: Vanaz – Civil Court (8 elevated stations’ construction on Aqua Line) | HCC – Al Fara’a JV |
P1UGC-01: Range Hills Ramp – Budhwar Peth (2.5 km tunnels and 2 stations’s construction for Line-1) | Gulermak – TPL Pune JV |
P1UGC-02: Budhwar Peth – Swargate (1.83 km tunnels and 3 stations’ construction for Line-1) | Gulermak – TPL Pune JV |
P1UG-04: Construction of TBM shafts at Agriculture College & Swargate, and Swargate Station | J Kumar Infraprojects |
Reach 3: Civil Court – Ramwadi (7.657 km viaduct’s construction for Aqua Line) | J Kumar Infraprojects |
Reach 3: Civil Court – Ramwadi (7 stations between Mangalwarpeth – Ramwadi on Aqua Line) | Afcons – SPCPL JV |
25KV Flexible Overhead Catenary system (OCS / OHE) with 22/25 KV RSS/TSS for Priority Section (PCMC – Phugewadi) of Line-1 | Bright Power Projects (India) Pvt. Ltd. |
Signalling & Train Control System of Phase 1 | Alstom Transport India Limited – Alstom Transport SA JV |
25KV Flexible & Rigid Overhead Catenary System (OCS / OHE) and sectioning posts for rest of Phase 1 | Alstom Transport India Limited – Alstom Transport SA JV |
Construction of maintenance depots at Range Hills & Vanaz | URC Construction (URCC) Pvt. Ltd. |
Receiving cum auxiliary main cum traction substations including high voltage cabling from grid substation, 33 KV cable network, ASS & SCADA system | Sterling & Wilson Pvt. Ltd |
Standard gauge track at Range Hills Depot and Reach-1 (PCMC – Range Hills) | Apurvakriti Infrastructure Pvt. Ltd |
Standard gauge track at Vanaz Depot and Reach-2 (Vanaz – Civil Court) | Apurvakriti Infrastructure Pvt. Ltd |
Design, supply, testing & commissioning of 104 coaches (34 train-sets of 3 coaches) | Titagarh Wagons Limited and Titagarh Firema S.p.A. |
Elevators & Escalators – Lot 1 | Johnson Lifts Private Limited |
Elevators & Escalators – Lot 2 | Schindler India Pvt Ltd and Schindler (China) Elevator Company Ltd. |
Line-1’s Tunnel Ventilation System (TVS), TVS-SCADA, Environmental Control System (ECS), ECS and E&M SCADA, LV Power System | Sterling and Wilson Pvt. Ltd. |
Telecommunication System | Honeywell Automation India Ltd. |
EMV Based Open Loop Automated Fare Collection (AFC system) | HDFC Bank Limited – Asis Elektronik ve Bilisim Sistemleri A.S. – Paycraft Solutions Private Limited |
Machinery and Plants for 2 rolling stock depots at Range Hills and Vanaz | URC – Swastik Overseas – Fabryka Obrabiarek Rafamet – Bertolotti Rail S.R.L. JV |
Fabrication, supply and installation of signage and graphics for 9 stations (PCMC – Dapodi) on Line-1 and 4 stations (Vanaz – Garware College) on Line-2 | Satin Neo Dimensions Private Limited. |
Supply of 3000 MT 60E1 (UIC 60) , 1080 Grade Head Hardened (HH) Rails | Jindal Steel & Power Ltd. |
Supply of 6000 MT 60E1 (UIC 60) , 1080 Grade Head Hardened (HH) Rails | Mitsui & Co., Ltd |
Design, manufacturing and supply of Standard Gauge 60E1 (UIC 60) Turnouts | Voestalpine VAE VKN India Pvt. Ltd. |
X-Ray Baggage Scanners, Door Frame Metal Detectors (DFMC), Hand Held Metal Detectors (HHMD) at 30 stations | Bharat Electronics Limited (BEL) |
Full Height Platform Screen Doors (PSDs) | KTK Group Company Ltd. |
Pune Metro History (Key Dates)
Phase 1
• 6 March 2022: PCMC – Phugewadi (Purple Line) – 6 km
• 6 March 2022: Vanaz – Garware College (Aqua Line) – 4.35 km
• 1 August 2023: Phugewadi – Civil Court (Purple Line) – 8.03 km
• 1 August 2023: Garware College – Ruby Clinic Hall (Aqua Line) – 5.45 km
• 6 March 2024: Ruby Clinic Hall – Ramwadi (Aqua Line) – 5.94 km
• 29 September 2025: District Court – Swargate (Purple Line) – 3.30 km
Click on ‘News & Construction Updates’ below for project news, progress and updates.