17 Bidders for Mumbai – Nagpur HSR’s Utility Survey & Traffic Study
India’s National High-Speed Rail Corporation Limited (NHSRCL) has received…
India’s National High-Speed Rail Corporation Limited (NHSRCL) has received…
The Delhi Metro Rail Corporation (DMRC) on September 29 and today opened financial…
Engineers from Larsen & Toubro last week commissioned Tunnel Boring Machine…
Paras Railtech and Pragati Construction Consultants are the two bidders for…
Afcons Infrastructure Ltd. and Shankaranarayana Constructions Pvt. Ltd. today…
Workers from China Civil Engineering Construction Corporation – KEC International…
Gujarat Metro Rail Corporation (GMRC) today reinvited bids from engineering…
Delhi Metro Rail Corporation (DMRC) on Friday opened technical bids from design…
Maharashtra’s Chief Minister on Sunday announced the state government’s decision to move the 33.5 km Mumbai Metro Line-3 (Aqua Line)’s…
Workers from Larsen & Toubro on Friday lowered and deployed the first flash butt welding machine at CSIA’s Terminal 2 Station to begin track-installation…
November 11 Update: Larsen & Toubro has been awarded Package 7’s Rs 723.35 crore contract. October 9 Original Post: Larsen & Toubro today…
October 14 Update: UPMRCL issued a LOA to Lisha Engineers for the depot’s Rs 112.63 crore construction contract. October 5 Original Post: That was…
Less than an hour ago, Tunnel Boring Machine S-616 (Urvi) operated by the ITD-ITD Cementation India Ltd JV made a breakthrough at Sealdah Station’s…
Three rail manufacturers today submitted tenders (bids) to supply and install ballastless tracks on the 2.95 km Kochi Metro’s Phase 1A &…