Afcons Awarded Delhi Metro Magenta Line’s DC-05 Contract

Another one down! Afcons Infrastructure on Friday was awarded a Rs. 2481.50 crore contract by Delhi Metro Rail Corporation (DMRC) for constructing Package DC05 of the Magenta Line’s 28.92 km Janakpuri West – RK Ashram extension.

This 7.46 km underground section connects a ramp north of Derawal Nagar with RK Ashram via 6 stations at Derawal Nagar, Ghanta Ghar, Pulbangash (interchange with Red Line), Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg (interchange with Blue Line).

DMRC invited tenders for this contract of the 65.1 km Delhi Metro Phase 4 project in June 2021 with a 42 month deadline financed by JICA through a Rs 8,390 crore loan.

Technical bids were opened in September to reveal 4 bidders and financial bids were opened in November, along with DC-07 & DC-08, to reveal Afcons as the lowest bidder – see all bid values here.

  • Final Contract Value: INR 2404,99,99,990.71 + EURO 85,79,782 (Approx. Rs. 2481,50,59,151.65)
  • Contract Date (Notice to Proceed): January 24, 2022
  • Completion Period: 42 months

Brief Scope: Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.

Alignment of Delhi Metro Magenta Line’s Package DC-05 – view Phase 4 route map with all stations’ exact locations marked

This is the 4th and final civil package of the Magenta Line’s 28.92 km Janakpuri West – RK Ashram extension. Other packages are 12.375 km DC-01, 7.473 km DC-03R, 2.03 km underground DC-06 – all of which are under construction.

As shared earlier:

  • Afcons will be required to use at least 4 tunnel boring machines (TBMs).
  • A 168 meter ramp and Derawal Nagar Station’s box will come up at Ismail Khan Park opposite Gurudwara Nanak Piao Sahib
  • The line curves around GT Road between Derawal Nagar and Ghanta Ghar to avoid Tripolia Gate (2 historic gates smack-dab on the highway)
  • Architectural drawings show Nabi Karim’s box getting built as a plus-shaped box to allow for a future interchange (a new 12.58 km Inderlok – Indraprastha line is in the works)
  • RK Ashram Station will include a 185 meter track cross-over to allow trains to switch between down and up lines. Entire cut and cover box (584.071m long) will come up north of the Blue Line’s existing station.

With this development, 2 of 4 JICA-funded underground packages of Phase 4 have been awarded. I hear DC-08 and DC-09 might be retendered, but that remains to be seen. For DC-05, I expect basic ground work to start in March with full-fledged construction work starting in June.

Civil PackageStatus
Package DC-05: Derawal Nagar to RK Ashram, 7.46 km underground section with 6 stationsAwarded to Afcons Infra
Package DC-08: Aerocity to Kishangarh, 6.11 km underground section with 4 stationsTata Projects is lowest bidder
Package DC-09: Kishangarh to Saket G-Block, 6.88 km underground section with 4 stationsAfcons Infra is lowest bidder
Package DC-07: Sangam Vihar to Tughlakabad, 6.477 km underground section with 3 stationsAwarded to Afcons Infra

See a list of all Phase 4 packages and their status here.

For more updates, check out the Delhi Metro section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG

written by

Global traveler who prefers mass rapid transit

18 Responses to "Afcons Awarded Delhi Metro Magenta Line’s DC-05 Contract"

  1. Ratnesh Kumar says:

    When we will get LOA for DC09? Any idea TMRG

    Reply
  2. Clevin Gomes says:

    Well some sources says that Inderlok-Indraprastha Line will be Extn. Of Green Line. If true then it will be a great relief and give some more Ridership to Green line. Is it Possible?

    Reply
  3. Er. N. Narayanan, CE/Projects says:

    Hi, I have few queries:-

    1. Will there be any Electrification Study and Electrification System Design for this package?
    2. Is there the S&T Study and S&T System Design for this package?
    3. Would DMRC onboard General Consultant for the project?
    4. Is there any PMC for this package?

    ThanQ
    N. Narayanan,
    CE/Projects/TANGEDCO.

    Reply
  4. Rupraj Sengupta says:

    So afcons will have at least 8tunnel boring machines in use in Delhi with two packages saves overhead costs.

    Reply
  5. Rupraj Sengupta says:

    So afcons will Have atleast 8tbms at work at delhi reducing overhead costs.

    Reply
  6. Jimmy Vij says:

    What’s the status of Rolling Stock contract for phase-4 ?

    Reply
  7. Clevin Gomes says:

    TMRG, BMRCL has finally floated Civil Tenders to construct Challagatta Depot

    Reply
  8. hirdesh kumar says:

    any underground construction manager pls contact me

    Reply
  9. Seeyal Sharma says:

    Job location

    Reply
  10. Maa construction says:

    I am contactor civil supply labour supply

    Reply

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply to Er. N. Narayanan, CE/Projects Cancel reply

Your email address will not be published. Required fields are marked *